Rigging procedures
Assembly
Procedure
1.
Secure the threaded rod to the main ceiling.
Position the threaded rod at the center of the tile frame.
The bottom end of the threaded rod should be approximately at 127 cm / 5 in of the tile frame.
m
in
. 1
27
m
m
/ 5
in
2.
Remove the placeholder screws on both sides of the enclosure.
T25
3.
Secure the X-U4i rigging bracket to the enclosure, with the front facing down, using the M5x16 Torx screws.
Use the hole leaving the most space between the enclosure and the accessory.
x2
5 N.m
T25
4.
(p.36).
X4r owner's manual (EN) version 1.0
31
Summary of Contents for X4r
Page 1: ...X4r owner s manual EN...