Follow these start-up instruction steps for initial start-up
before building repopulation. For normal start-up, simply
turn the thermostatic head above room temperature.
1. Open all gas supply valves to the heater(s) and check
for gas leaks at all connections using approved lead
detectors.
2. Adjust the thermostatic head, located on either the
zone control panel, or for individually controlled
heaters, directly on the heater, to its maximum
temperature setting. See Fig. 7.
FIG. 7
3. Fully depress the button on the safety control valve
while applying flame to the inner cone point. Keep
the button fully depressed for about 30 seconds until
the inner cone stays lit. Allow outer combustion cone
to heat up completely.
4. Adjust the temperature by decreasing the setpoint on
the thermostatic head to the desired temperature.
The heater will cycle from low heat to high heat
based upon thermostatic head set point.
FIG. 8
INDICATOR
100ºF
38ºC
THERMOSTATIC
HEAD
11
Start-Up Instructions
To reduce temperature, simply turn down the thermostatic
control on the zone panel or on the individual heater.
To shut down the heaters for maintenance, cleaning or
service:
1.
Shut off all gas supply valves to the heaters.
2.
Allow heaters to burn off fuel gas remaining in the
gas supply line.
3.
Turn down the thermostatic head to minimum
setting.
Shut-Down Instructions
PILOT BUTTON
PILOT CONTROL VALVE
BUTTON
SAFETY CONTROL VALVE
WARNING
Fire oor EExplosion H
Hazard
■
Do not force the safety gas control valve button.
■
Use only your hand to depress the gas control button.
Never use any tools.
■
If the button will not depress by normal hand
pressure, the control should be replaced by a
qualified service person.
■
Force or attempted repair may result in fire or
explosion, causing property damage, severe injury, or
death.