Gas Conversion Kit
Gas Conversion Kit •Individual and Zone Controlled Radiant Brooders
3
Conversion:
1. Reconnect the gas hose to the brooder, tightening it securely.
2. Ensure proper hanging confi guration. See the back of this instruction sheet.
3. Open the fuel supply valve and leak check using approved leak detectors.
4. Light the brooders and check for proper operation.
5. Set the second stage regulator to ensure proper gas supply pressure to all heaters in the zone. Check pres-
sure at maximum and minimum heat output. Refer to Clearance and Data Plate disk on brooder or to zone
panel.
6. When steps 1 – 5 are complete, set the temperature control on the zone panel or on individual control brood-
ers to desired setting.
7. Keep these instructions for future use.
ATTENTION:
• Ensure the brooder is hung so its control is positioned 10 to 50 down from horizontal after the gas supply hose
is attached. This allows proper venting of the brooder and prevents potential heat damage to the fi lter.
• Repositioning of the hanging brackets key ring may be required to achieve proper hanging position.
Installation Layout for Safe Clearances:
INSTALLATION LAYOUT
FOR SAFE CLEARANCES
I17 - 3 FT. MINIMUM
BROODER TOP TO CEILING
POSITION THE GAS HOSE AND ELECTRICAL POWER CORD
OUTSIDE OF THE HOT ZONE DIRECTLY ABOVE THE HEATER.
POSITION THE GAS HOSE AND POWER CORD TO AVOID
ANY OPPORTUNITY FOR CONTACT WITH THE HOT CANOPY
SURFACE OF THE HEATER.
MINIMUM 3 FT. CLEARANCE
TO COMBUSTIBLES
FLOOR
I17 - 3.5 FT. MINIMUM
POINT OF COMBUSTION
CONE TO FLOOR
HANG THE HEATER WITH THE
CONTROL END 1 TO 5 DEGREES DOWN
FROM HORIZONTAL (SEE BELOW)
CONTROL PANEL
GAS PIPING
THIS
NOT THIS
CONTROL END
KEYRING
STEEL CABLE
HANGING
CONTROL END
OR CHAIN
BRACKET
OF HEATER
MUST BE 1 TO 5 DOWN
FROM HORIZONTAL