background image

 

 

 

 

Venezia-17 

User manual 

P. Ind. Hacienda Dolores, C/6 – Nave 13

Alcal

á

 de Guadaira – Seville - Spain 

p. +34 955 63 09 07 

f. +34 955 63 08 13 

larocca@larocca.es

www.larocca.es

 

Summary of Contents for Venezia-17

Page 1: ...Venezia 17 User manual P Ind Hacienda Dolores C 6 Nave 13 Alcalá de Guadaira Seville Spain p 34 955 63 09 07 f 34 955 63 08 13 larocca larocca es www larocca es ...

Page 2: ...NE III Switch off the machine 7 IV Normal operation 8 ESPRESSO BREWING DISPENSING HOT WATER STEAMING AND FROTHING MILK V Programming 10 BUTTON FUNCTIONS PROGRAMMING THE DOSAGE SETTING THE CLOCK CHECKING THE COUNTERS VI Coffee machine cleaning 13 IMPORTANT DAILY CLEANING WEEKLY CLEANING STORAGE OF MACHINE VII Technical data 16 DIMENSIONS ...

Page 3: ... GAUGE 4 KEYBOARD GROUP 2 5 LCD DISPLAY 6 KEYBOARD GROUP 1 7 NET PRESSURE GAUGE 8 STEAMER LEVER 1 9 HOT WATER WAND 10 STEAMER WAND 1 11 WORKING TRAY 12 ADJUSTABLE FEET 13 REMOVABLE TRAY 14 FILTERHOLDER GROUP 1 15 FILTERHOLDER GROUP 2 16 STEAMER WAND 2 ...

Page 4: ...gging in check that nameplate data correspond with those of the electric and water mains 5 The coffee machine should be placed on a stable flat surface with the bodywork at a minimum distance of 20 mm from the supporting surface and the walls Furthermore it must be installed taking into account that the highest shelf cup warmer must sit at a height that is at least 1 5 meters Room temperature must...

Page 5: ... installation surface at least 110 cm off the floor The place where the machine is to be installed must have a connection to the water supply network to the sanitation network and a connection to the electricity network with the same characteristics as those indicated on the data plate of the machine Make the hydraulic connections in conformity to the hydraulics safety laws in force in the country...

Page 6: ...ct the other to the main drainage tube at the installation area Only use the hoses supplied with the machine Never reuse hoses Make sure that the drainage tube is not twisted and ensure that the entire tube has a descending path The coffee machine should only be connected to the power supply by qualified personnel The following safety instructions should be followed at all times Check that the ele...

Page 7: ... you can turn it on by pressing the double espresso button of the group 1 6 All the dose buttons will light and as the water level in the boiler is less than the minimum required the boiler will start filling up to the correct level Once the boiler is filled the machine will start to heat the water in the boiler until the programmed temperature is reached 120º by default The display will show the ...

Page 8: ...e the pressure is adjusted to 8 9 bar you can close the hole for the adjustment with the plastic cap included in the bag of the technical data sheet of the machine When the display shows 120ºC the machine is ready to start working Chapter IV details the main functionalities of the machine Switch off the machine If you want to turn off the machine you have to press the continuous button and without...

Page 9: ...eshly ground espresso beans Press down the coffee with a coffee tamper Clean the borders of the filter with a quick movement of the finger or the palm of the hand since the filter holder is at a high temperature and can cause burns due to prolonged contact Insert the filled filterholder into the group head and lock it into correct position Place one or two cups beneath the outlet spouts Select the...

Page 10: ...r down following your preference for a few seconds to allow the condensed water to be ejected That is not necessary if the steamer has been used recently less than 5 minutes Close the steam tap take the lever 2 or 8 to the middle position when only steam comes out 2 3 seconds Let immerse the steam wand 10 or 16 into the milk jug Open the steamer by moving again the lever 2 or 8 up or down Keep the...

Page 11: ...ave to press the button of the dose that you want to program so load the filterholder with ground coffee adequate to this dose and insert it on the group Place the cup or cups below the coffee spout Press once the button of the dose and wait for the coffee to fill the cup When the desired volume has been reached press again the dose button and the coffee will stop pouring Now the dose is programme...

Page 12: ...urs can be modified with the or keys When the right value is settled you can press Ok to accept and the minutes will start to blink Select again the right value with and and press Ok when the desired minutes are settled Finally set the day of the week the same way pressing Ok to accept it To abandon the programming mode and reach the stand by screen on the LCD press twice the programming key CHECK...

Page 13: ...een From now on press the continuous key to check all the counter pages Pressing once we get the liters remaining for the scheduled revision Pressing once again we get the total coffees served And finally the counters of every coffee served by every dose of every group of the machine ...

Page 14: ...r without detergent Only using hot water Clean the external surfaces of the machine Pay special attention to the stainless steel parts Clean the steam wand and the water outlet Be sure that the nozzles are not blocked or half blocked with for example milk remains If it s necessary to clean be careful not to deform or damage any of the components Clean the drip tray with a brush You can slowly pour...

Page 15: ...t detergent Insert the filterholder in the group head but do not tighten fully the filterholder should be loose Press the Continuous Dispensing button on the button panel Make an opening closing movement of the filterholder in place without closing it Water will now flow around the filterholder flowing through the closing surface and cleaning it Remove the filterholder from the group head Clean th...

Page 16: ...nect the inlet hose from the machine to the water mains and empty the boiler This should be performed by a qualified person Clean the drip tray and exterior of the machine Cover pack the machine and store it in a dry place where it isn t exposed to bad weather conditions If the machine is stored on premises where the temperature may drop below freezing point always empty the boiler and the water c...

Page 17: ...73 Boiler volume l 12 17 Power w 2 600 3 500 opt 3 700 4 500 opt Dimensions width 730 970 Dimensions height 510 510 Dimensions depth 570 570 Built in pump yes yes Available finishing Inox black white Inox black white Automatic water load in boiler yes yes 2nd steamer yes yes Programmable hot water yes yes Cappuccinatore Opt Opt Serial connection to PC Opt Opt DIMENSIONS ...

Reviews: