20 Industrial Way, Rochester, NH 03867
•
603.335.6300 • Fax 603.335.3355
1355 Kuehner Drive, Simi Valley, CA 93063
•
800.900.9276
•
Fax 800.559.1583
(Sales, Service)
480 S. Service Rd. West, Oakville, Ontario, Canada L6K 2H4
•
905.844.8233
•
Fax 905.844.2635
www.Laars.com
Litho in U.S.A. © Laars Heating Systems 0603
LOW LOSS HEADER FOR MASCOT HT-1.450 & HT-1.650 SINGLE
BOILER INSTALLATION
The following instructions are essential for the correct installation of the Low loss header.
The Hydronic Package and Connection Kit enables quick installation of a wall-mounted Mascot boiler by
providing all necessary plumbing accessories.
The assembly requires the following components:
LM-714094110 (Connection Kit for Hydronic package)
- Delivery manifold with safety valve fitting
- Elbow for safety valve
- Delivery shut-off valve (two way)
- Return shut-off valve (two way)
- Circulator
- Check valve
- Gaskets: G 2 1/2” - G 1 1/2” – G 1” - G 3/4”
LM-714094110 (Hydronic package)
-
Low Loss Header
CA003300 (2 adaptors)
-
2 ½ British male to 2 ½ NPT male and 2” IPS female
threads.
The safety valve 30 p.s.i. (2.1 bar) is supplied with the boiler
Figure 1: Assembly Contents