LAARS HEATING SYSTEMS

operate at high altitudes have appropriate
stickers or tags attached.

3.

The figures in Table 3 should be used to size the
gas piping from the gas meter to the boiler.
Check local codes for BTU/h capacity required.

4.

Install a sediment trap (drip leg) ahead of the gas
controls (see Figure 4). Fit the trap with a
threaded cap which can be removed for cleaning.

5.

When required by code, install a second manual
gas shutoff valve. Do not remove manual shutoff
valve supplied with the boiler.

6.

Disconnect the boiler and its individual shutoff
valve from the gas supply piping system during
pressure testing of the system at pressures higher
than 1/2 psi (3.5 kPa). Isolate the boiler from the
gas supply piping system by closing its
individual manual gas shutoff valve during any
pressure testing of the gas supply piping system
at test pressures equal to or less than 1/2 psi
(3.5 kPa).

7.

Gas supply pressures to the boiler are listed in
Table 4.

Supply Pressure

Water Column

Natural Gas

Propane Gas

in.

mm

in.

mm

Minimum

5

127

9

229

Maximum

9

229

14

356

Table 4. Gas Supply Pressure Requirements.

au systéme d’évacuation est mis à l’air libre de
façon adéquate. Remettre les portes et les
fenêres, les ventilateurs, les registres de
cheminées et les appareils au gaz à leur position
originale.

7.

Tout mauvais fonctionnement du systéme
d’évacuation commun devrait êvacuation
commun devrait être corrigé de façon que
l’installation soit conforme au National Fuel
Gas Code, ANSI Z223.1/NFPA 54
 et (ou) aux
codes d’installation CAN/CGA-B149. Si la
grosseur d’une section du systéme devrait être
modifié ppour respecter les valeurs minimales
des tableaux pertinents de l’appendice F du
National Fuel Gas Code, ANSI Z223.1/NFPA 54
et (ou) des codes d’installation CAN/CGA-B149.

2F. Gas Supply and Piping

Review the following instructions before

continuing the installation.

1.

Gas piping installation must be in accordance
with the latest edition of ANSI Z223.1/NFPA 54.
In Canada, the installation must be in accordance
with CAN1-B149.1 or .2 and all local codes that
apply. See Figure 3 for boiler gas valve
arrangement.

2.

Check the rating plate to make sure the boiler is
fitted for the type of gas being used. Laars
boilers are normally equipped to operate below a
2000 foot (610m) altitude. Boilers equipped to

Distance from Gas Meter or Last Stage Regulator

0-100 feet

100-200 feet

200-300 feet

0-30m

30-60m

60-90m

Natural

Propane

Natural

Propane

Natural

Propane

Size

in.

mm

in.

mm

in.

mm

in.

mm

in.

mm

in.

mm

320M

400M

520M

625M

775M

1000M

1.25

1.25

1.50

1.50

2.00

2.00

32

32

38

38

51

51

1.25

1.25

1.25

1.25

1.50

1.50

32

32

32

32

38

38

1.50

1.50

2.00

2.00

2.00

2.50

38

38

51

51

51

64

1.25

1.25

1.50

1.50

1.50

2.00

32

32

38

38

38

51

1.50

2.00

2.00

2.00

2.50

3.00

38

51

51

51

64

76

1.50

1.50

1.50

2.00

2.00

2.50

38

38

38

51

51

64

Notes: 1. These numbers are based on 1/2 inch (13mm) water column pressure drop.

2. Check supply pressure and local code requirements before proceeding with work.

3. Pipe fittings must be considered when determining gas pipe sizing.

Table 3. Natural Gas and Propane, Pipe Size Requirements.

Summary of Contents for Mighty Max HH1000M

Page 1: ...e technician qualified in hot water boiler installation and maintenance Improper installation and or operation could create carbon monoxide gas in flue gases which could cause serious injury property...

Page 2: ...tion Air 15 2M 3 Conversion for Ducted Combustion Air 15 2M 4 Combustion Air Piping 16 2N Electrical Wiring 16 SECTION 3 Operating Instructions 3A Start Up Requirements 16 3B Hi Limit checkout 18 3C V...

Page 3: ...ion and maintenance instruction for the Mighty Max hydronic boiler Model HH sizes 320M 400M 520M 625M 775M and 1000M Review all application and installation procedures completely before proceeding wit...

Page 4: ...lated or otherwise protected from any source of corrosive chemical fumes such as trichlorethylene perchlorethylene chlorine etc Install the boiler so that the gas ignition system components are protec...

Page 5: ...nnected to the common venting system properly vents when tested as outlined above return door windows exhaust fans fireplace dampers and any other gas burning appliances to their previous condition of...

Page 6: ...au National Fuel Gas Code ANSI Z223 1 NFPA 54 et ou aux codes d installation CAN CGA B149 Si la grosseur d une section du syst me devrait tre modifi ppour respecter les valeurs minimales des tableaux...

Page 7: ...n Used On Canadian Unit or U S Unit Requiring CSD 1 Code Automatic Main Gas Valves NOTE The boiler and all other gas appliances sharing the boiler gas supply line must be firing at maximum capacity to...

Page 8: ...h the boiler expressed in ft of H2O Shaded area is the recommended flow and temperature rise Minimum inlet temperature is 105 F Table 5 Temperature Rise TEMPERATURE RISE IN DEGREES F C MODEL 10 F 6 C...

Page 9: ...he heater which will be used to supply potable water to any heating system or components previously used with a nonpotable water heating system Do not add boiler treatment or any chemicals to the heat...

Page 10: ...diation units for one 1 hour 10 Recheck the water level in the expansion tank If the water level exceeds 1 4 of the volume of the expansion tank open the tank drainer and drain to that level 11 Shut d...

Page 11: ...nting and Combustion Air Options Vertical Venting Category I Combustion Air In Through Louvers Side View Wall NOTE All views are shown from rear of heater Horizontal Intake Terminal Detail Combustion...

Page 12: ...er Jacket Blank Plate On Flue Collector Blank Plate On Boiler Jacket Top Panel 1 Removal of Blank Plate and Adapter Plate From Boiler 3 Blank Plate Placement Over Stack Top Opening Blank Plate Flue Co...

Page 13: ...al vents must be installed in accordance with the special code requirements for Category I Fan Assisted Appliances These requirements can be found in the latest edition of ANSI Z223 1 NFPA 54 Appendix...

Page 14: ...2m horizontally from or 3 feet 0 9m above such openings 4 Locate the vent terminal so that it cannot be blocked by snow The National Fuel Gas code requires that it be at least 12 inches 305mm above g...

Page 15: ...of the Laars side wall terminal Locate the terminal within 10 feet 3 0m of the boiler vent exhaust terminal but no closer than 3 feet 0 9m centerline distance Do not locate the air inlet terminal near...

Page 16: ...in the wiring diagram supplied with the boiler see Figure 12 3 Electrically interlock the pump and boiler so the boiler cannot come on unless the pump is running 4 Connect all field installed devices...

Page 17: ...rvicing controls wiring errors can cause improper and dangerous operation Verify proper operation after operation servicing ATTENTION Au moment de l entretien des commandes tiquetez tous les fils avan...

Page 18: ...back up to its original setting and the hi limit is reset 3C Venturi and Gas Pressure Regulator System 3C 1 Overall Operation The gas control system of the Mighty Max boiler is similar to that of a ca...

Page 19: ...ake a pressure reading This reading is called the gas pressure offset Using the regulator only adjust the gas pressure offset according to the installation s altitude in Table 5 0 4 w c at sea level R...

Page 20: ...sures is far more important than their gauge value relative to the room The gas pressure offset and the gas orifice pressure differential are especially important concepts The following section descri...

Page 21: ...rence in pressure between the venturi inlet tap and the outlet of the gas regulator see Figure 17 This measurement is taken by connecting the positive side of the manometer to the venturi inlet tap an...

Page 22: ...wc at sea level Use the blower shutter to adjust the gas orifice differential 6 By adjusting the gas orifice differential the gas offset pressure will change Therefore you must repeat steps 3 5 until...

Page 23: ...vicing the heat exchanger 1 Disconnect the 120 Vac electrical supply to the heater 2 Turn off the gas supply by closing the manual gas valve on the heater 3 Disconnect and remove the wires and conduit...

Page 24: ...may need to be cleaned daily Failure to do so could result in lower heat output and potential unsafe operation SECTION 5 Troubleshooting 5A Sequence of Operation To troubleshoot the heater properly y...

Page 25: ...Mighty Max Hydronic Boiler Page 25 Figure 20 Troubleshooting Chart...

Page 26: ...irculating water and the foregoing items check out okay the trouble may be in the boiler control system IMPORTANT Disconnect power to the boiler before removing or replacing any component or wire conn...

Page 27: ...mbly 320M 20254901 400M 20254902 Item Description Part Number 520M 625M 20260100 U S 20260101 Canada 775M 20260200 U S 20260201 Canada 1000M 20265600 U S 20265601 Canada Gas Valve 320M 425M V2003900 5...

Page 28: ...Page 28 LAARS HEATING SYSTEMS Front View Right Side View 36 10 8 9 5 20 7 12 13 11 3 6 21 14 15 38 4 1 2...

Page 29: ...Mighty Max Hydronic Boiler Page 29 Front View Rear View Right Side View Left Side View 31 32 17 30 23 26 27 28 25 37 25 33 16 18 35 29 19 34 39...

Page 30: ...Left 20152900 30 Panel Access 320M 20157401 400M 20157402 520M 20157403 625M 20157404 775M 20157405 1000M 20157406 Item Description Part Number 31 Panel Back 320M 20157201 400M 20157202 520M 20157203...