background image

Start Up Guide 

Document 1278

Start Up Guide for

N

EO

T

HERM

  ® 

Modulating Boilers and  

Water Heaters with the 

EMEA Display

                 

Model NTH & NTV

Sizes 080–850 MBTU/h

Summary of Contents for NEOTHERM NTH Series

Page 1: ...Start Up Guide Document 1278 Start Up Guide for NEOTHERM Modulating Boilers and Water Heaters with the EMEA Display Model NTH NTV Sizes 080 850 MBTU h...

Page 2: ...tral Heat set point 7 Adjust DHW set point 7 Single boiler Outdoor reset 7 Low Water Temperature 8 Max Outdoor Temperature 8 Min Outdoor Temperature 8 Warm Weather Shut Down 8 Cascading multiple boile...

Page 3: ...to the choice you want to select in the display area Back button Use this button to return to the previous display Info Install button Press this button at any time to access the sub menus that allow...

Page 4: ...ires a password enter it here Password is LNT in lower case lnt Test Allows you to choose Forced Firing Manual Burner or Manual Pump Operation Advanced Setup Allows you to configure the system setting...

Page 5: ...ht the ok button on the screen Now press the round OK button on touch pad Navigation Home Screen Press I Info Install button Use Arrow buttons to highlight Quick Start Press OK Select CH Setpoint Pres...

Page 6: ...ome Screen you can change the parameters Navigation Home Screen press I Info Install button Scroll to highlight Display Setup press OK Highlight the line you would like to change example Line 2 Operat...

Page 7: ...ted press OK Using the arrows and OK button adjust the set point see the bottom of page 5 After pressing the round OK button to confirm a set point the display will go back to the Quick Start screen Y...

Page 8: ...oor Temp Press OK and adjust the set point If needed see the bottom of page 5 Min Outdoor Temp Navigation Starting at the Quick Start screen use the Down arrow button to Highlight Min Outdoor Temp Pre...

Page 9: ...g Master Configure is highlighted press OK Scroll down to Setpoint press OK Adjust the setpoint press OK see bottom of page 5 Lead Lag Outdoor Reset Navigation Home screen press I Info Install button...

Page 10: ...OK Scroll to highlight Lead Lag Configuration press OK Lead Lag Master Configure will be highlighted press OK Master enable should be highlighted press OK Confirm that this function is enabled If not...

Page 11: ...Log in Password LNT in lower case Press OK and Log in See the top of page 5 for instructions With Boiler name highlighted again press OK to advance to the boiler name keypad Using the same steps to l...

Page 12: ...e number for boilers 2 through 8 Press OK Next use the down arrow button to highlight MB2 Modbus Address press OK Log in the password is LNT in lower case Change the MB2 address then press OK Note It...

Page 13: ...be running to start High or Low fire test Set High Fire will be highlighted press OK Scroll down to Start Test press OK You will now have five minutes to complete the High fire CO2 adjustments Low Fir...

Page 14: ..._______ _______________________________________ _______________________________________ _______________________________________ _______________________________________ ________________________________...

Page 15: ..._______ _______________________________________ _______________________________________ _______________________________________ _______________________________________ ________________________________...

Page 16: ...__ _______________________________________ _______________________________________ _______________________________________ _______________________________________ _____________________________________...

Reviews: