Page 10
LAARS Heating Systems
Number of
Boilers
Base load
value
1
NA
2
65%
3
50%
4
35%
5
35%
6
35%
7
35%
8
35%
11. Adjust the
“Base Load Common”
value to the number of boilers
in the cascade system. See chart for values.
Note:
In the Lead/Lag Slave Sub-Menu, Identify each control (including the Lead/Lag Master) as a slave by
turning on
“Slave Enable.”
12. From the Status Summary Screen, press the
“Configure”
button.
13. Scroll down and press
“Lead Lag Slave Configuration”.
Lead/Lag Master Control continues
10