LAARS Heating Systems
Page 118
fig. 135 – Pump test
12.5 lead/lag Slave Diagnostics
The control system includes a diagnostic screen that
lists some information on the Lead/Lag slaves in the
system. See Fig. 136.
How to get there –
Home Page <View Lead Lag button> Lead Lag
Screen <Lead Lag Master button> Lead Lag Screen
<Diagnostics button> Lead Lag Slave Status Screen
12.6 Statistics
The controller can present some summary information
about the operation of the system – number of pump
cycles, number of burner cycles, etc.
How to get there –
Home Page <Select icon> Status Summary Screen
<Configure button> Configuration List <Select Statistics
Configuration line> Statistics Configuration Screen
Fig. 137 – Statistics Configuration Screen
fig. 136 - lead/lag Slave Status
Use the left- and right-arrows to see all of the
columns in the display.
Summary of Contents for NTV1000
Page 2: ......
Page 35: ...NeoTherm Boilers and Water Heaters Page 31 Fig 20 Ladder Diagram...
Page 36: ...LAARS Heating Systems Page 32 Fig 21 Wiring Diagram...
Page 37: ...NeoTherm Boilers and Water Heaters Page 33...
Page 51: ...NeoTherm Boilers and Water Heaters Page 47 Fig 52 Connection Terminals...
Page 130: ...LAARS Heating Systems Page 126 Fig 140 Machine Frame and Rear Panel 13 3 PARTS ILLUSTRATIONS...
Page 131: ...NeoTherm Boilers and Water Heaters Page 127 Fig 141 Front Panel and Covers...
Page 132: ...LAARS Heating Systems Page 128 Fig 142 Burners and Combustion Chambers...
Page 134: ...LAARS Heating Systems Page 130 Fig 145 Electronic Components...
Page 135: ...NeoTherm Boilers and Water Heaters Page 131 Fig 146 Condensate Trap Fig 147 Control Bezel...
Page 136: ...LAARS Heating Systems Page 132 Fig 148 Flow Switch...
Page 137: ...NeoTherm Boilers and Water Heaters Page 133 This page intentionally left blank...