1. From the Home screen (Fig. 82), press the
View Lead Lag button.
fig. 82 – Home Screen
2. If the system were running, the following
screen would normally show the current
activity of each unit in the Lead/Lag system.
See Fig. 83.
fig. 83 – lead/lag Screen
3. To set up the Lead/Lag Master function, press
the button for Lead Lag Master. Fig. 84 shows
the screen that follows.
fig. 84 – lead/lag master Screen
4. Press the Configure button. The display will
present the Lead/Lag Master Configuration
Screen (Fig. 85).
Fig. 85 – Lead/Lag Master Configuration
5. This screen shows the most important settings
for the Lead/Lag system. The settings can be
changed from this screen. Some of them will
require passwords.
Summary of Contents for NTV1000
Page 2: ......
Page 35: ...NeoTherm Boilers and Water Heaters Page 31 Fig 20 Ladder Diagram...
Page 36: ...LAARS Heating Systems Page 32 Fig 21 Wiring Diagram...
Page 37: ...NeoTherm Boilers and Water Heaters Page 33...
Page 51: ...NeoTherm Boilers and Water Heaters Page 47 Fig 52 Connection Terminals...
Page 130: ...LAARS Heating Systems Page 126 Fig 140 Machine Frame and Rear Panel 13 3 PARTS ILLUSTRATIONS...
Page 131: ...NeoTherm Boilers and Water Heaters Page 127 Fig 141 Front Panel and Covers...
Page 132: ...LAARS Heating Systems Page 128 Fig 142 Burners and Combustion Chambers...
Page 134: ...LAARS Heating Systems Page 130 Fig 145 Electronic Components...
Page 135: ...NeoTherm Boilers and Water Heaters Page 131 Fig 146 Condensate Trap Fig 147 Control Bezel...
Page 136: ...LAARS Heating Systems Page 132 Fig 148 Flow Switch...
Page 137: ...NeoTherm Boilers and Water Heaters Page 133 This page intentionally left blank...