background image

 

LAARS Heating Systems

Page 6

SHUTTING DOWN THE NEOTHERM LC

it may sometimes be necessary to shut down the neotherm LC. here are the steps required to do this:
1.  switch off the main electrical disconnect switch.
2.   (Model 1000) remove the front access panel and close the main manual gas valve. 

(Model 1700) turn oFF the main manual gas valve. the valve is top left on the back. 

3.  if freezing is anticipated, drain the neotherm LC.  (also be sure to protect the piping in the building 

from freezing.)

The steps listed above may require qualified service personnel.

RESTARTING THE NEOTHERM LC

it may be necessary to restart the neotherm LC – for example, after a power interruption.  here are the steps 

required to do this:
1  reset any errors using the user interface.  see the section on “about Lockouts, holds, and alerts.”
2  turn up the thermostat to call for heat.

3.  In approximately 2 seconds, the blower will operate.  Ignition should occur after 35-40 seconds. It may 

take as long as 2-1/2 minutes.

4.  if ignition does not occur, wait 5 minutes and then repeat steps 1 through 3.
5.  if, after three attempts, the unit still does not light, shut down the boiler and call your service technician.

if the unit has been drained, follow these steps:

1.  See the “Installation and Operation Manual” for instructions on filling and purging the unit.

2.  (Model 1000) remove the front access panel and turn on the main manual gas valve. 

(Model 1700) turn oFF the main manual gas valve. the valve is top left on the back.

3.  switch on the main electrical disconnect switch. the pump and blower will start, and the igniter will be 

energized.  after 35 seconds the gas valve will be energized, and ignition will occur. if ignition does not 

occur within 2-1/2 minutes switch “off” the main disconnect switch, wait 5 minutes and switch it “on” 

again. if after three attempts ignition does not occur, shut down the unit and call for service.

IN THE EVENT OF POWER FAILURE

the neotherm LC will not operate during an electrical power outage. if there is an extended power outage 

with danger of freezing, then the neotherm LC (and all other water systems) should be completely drained.   

Before draining the unit, turn off the gas and turn off the main power switch. When you replace the unit in 

service, refer to the “Installation and Operation Manual” for instructions on filling and purging.

Summary of Contents for NTV1700

Page 1: ...tch do not use any phone in your building Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire departme...

Page 2: ...LAARS Heating Systems...

Page 3: ...e Operating 2 What to Do If You Smell Gas 2 Pour Votre S curit Lisez Avant de Mettre en Marche 3 Que Faire si Vous Sentez une Odeur de Gaz 3 Lighting the Unit 4 Turning Off the Gas to the Unit 4 Instr...

Page 4: ...to turn the handle on the gas valve Never use tools If the valve handle will not turn by hand don t try to repair it Call a qualified service technician If you force the valve or try to repair it this...

Page 5: ...er la soupape d arr t de gaz N utilisez jamais d outils Si la poign e de la valve ne tourne pas manuellement ne tentez pas de la r parer Communiquez avec un technicien de service qualifi Le fait de fo...

Page 6: ...ont panel LIGHTING THE UNIT 1 STOP Read the safety information on the previous pages first 2 Set the thermostat to the lowest setting 3 Turn off all electric power to the unit 4 This unit is equipped...

Page 7: ...en haut gauche l arri re 4 Mettez la soupape d arr t de gaz OFF La valve est en position OFF lorsque la poign e se trouve angle droit du tuyau de gaz 5 Mod le 1000 Remplacer le panneau d acc s avant...

Page 8: ...If after three attempts the unit still does not light shut down the boiler and call your service technician If the unit has been drained follow these steps 1 See the Installation and Operation Manual...

Page 9: ...ilers with up to eight burners and eight burner controllers All managed through one 1 User Interface on the Lead boiler After the system starts the User Interface Panel will automatically present the...

Page 10: ...e shown above the complete system includes one boiler with two burners To check the operation of an individual burner press one of the large icons on the Home screen The system will present a Status S...

Page 11: ...of the control system s operation was not correct delayed or waiting for a response This does not necessarily indicate a problem If a problem occurs while the system is starting up the system will dec...

Page 12: ...ny part of the control system and any gas control which has been under water must be replaced WARNING If the unit overheats or the gas supply fails to shut off do not turn off or disconnect the electr...

Reviews: