Product Service 1-800-522-7658
5
C
HAPTER
2
P
REREQUISITES
Before you install your blower, you need to prepare your site for installation. A
dedicated source of electrical power must be located near the installation site.
Carefully read this chapter to learn:
The location requirements for your installation site.
The mounting support requirements for your installation site.
The electrical power requirements for your installation site.
The fume hood controls, controls wiring, and controls modifications for
your installation site.
The space requirements for your installation site.
Refer to
Appendix B: Blower Dimensions
for complete blower dimensions.
Refer to
Appendix C: Blower Environmental Conditions
for complete
environmental conditions and wiring diagram.
Location Requirements
In positioning your blower, care should be taken to make sure that it is away from
all other types of air handling equipment (intake fans, air conditioning units, etc.).
Your blower should also include a minimum of 7 ft. of ducting above the roofline
to generate proper air dispersion of materials being exhausted through the blower.
Also consider the location of the blower inlet with respect to the hood you are
exhausting. Proper planning and layout are essential in selecting a blower
location.
Summary of Contents for 7061110
Page 36: ...Chapter 5 Using Your Blower Product Service 1 800 522 7658 32 Original instructions...
Page 48: ...Chapter 7 Modifying Your Blower Product Service 1 800 522 7658 44 Original instructions...
Page 58: ...Chapter 9 Troubleshooting Product Service 1 800 522 7658 54 Original instructions...
Page 62: ...Product Service 1 800 522 7658 58 APPENDIX B BLOWER DIMENSIONS...
Page 63: ...Appendix B Blower Dimensions Product Service 1 800 522 7658 59 Original instructions...
Page 64: ...Appendix B Blower Dimensions Product Service 1 800 522 7658 60 Original instructions...
Page 72: ...Product Service 1 800 522 7658 68 APPENDIX F TYPICAL PERCHLORIC ACID HOOD INSTALLATION DIAGRAM...