Product Service 1-800-522-7658
4
C
C
h
h
a
a
p
p
t
t
e
e
r
r
2
2
:
:
I
I
n
n
s
s
t
t
a
a
l
l
l
l
a
a
t
t
i
i
o
o
n
n
Preparation
The Goldfisch Extractor is shipped complete and fully assembled. The operating
parts shipped with the unit will be installed after the unit has been located in the
laboratory area.
Location
Choose a location in the laboratory which has a convenient 115 volt A.C. outlet,
an unrestricted 3/8" NPT cold water supply and drain facilities of at least 3/4"
NPT.
Caution:
The Goldfisch Extractor should be operated inside an explosion
proof hood with proper airflow to handle the extremely flammable solvents that
are used during the Goldfisch Extractor’s normal operation.
Utility Connections
(1)
Once the unit has been placed in its final location, connect the cold water
supply to the 3/8" NPT control valve water fitting on the upper left.
(2)
Connect the 3/8" NPT control valve on the upper right to an open drain of
sufficient size (3/4" IPS or larger) to accommodate the cooling water.
Cooling water should be a minimum of .75 gal/min or 2.8L/min for flow
(55 °F (13 °C) or less is preferable).
(3)
Plug the unit into an electrical outlet.
Initial Start-Up and Check Out
Turn main power and variable heat control switches on. Make sure all heating
elements heat properly. Wait two to three minutes.