Gynecology Study
Nexam Pro User Manual
109
Filling phase (continue)
Press the
Pump
button to start the pump.
You can mark the sensations. At different filling volumes you may stop
the pump to perform rest and stress profiles.
When the patient is unable to tolerate further filling or if the bladder is
filled sufficiently, press the
Pump
button to stop.
Press the
End filling phase
button to place the Storage phase marker.
You can do different tests now to provoke leakage. Press the
Leak
point
button to mark leakage.
Press the
Voiding
phase
button to mark end filling phase. The
investigation is now temporarily halted. Reposition the patient if
necessary.
Voiding phase
Press the
Start
voiding
phase button.
Press the
Permission to void
button to mark this command and then
leave the patient alone. The LED on the remote control (RC-1600) will
provide you with feedback when the uroflow has been finished. Also,
the buzzer of the remote control will beep after the flow has stopped.
(You can find more information in § 12.3.4).
If wanted, you can activate the
Tap water sound
during miction. Click
the button again to deactivate.
Press the
Stop
investigation
button. Enter the residual urine if
prompted.
Summary of Contents for Nexam Pro CIM
Page 1: ...Nexam Pro User Manual...