AUTOMIZER
VERSA HAND
TM
1-38
1.12.6
PACKER REMOVAL
PACKER REMOVAL
PROCEDURE
1.
Ensure that the parking brake is
applied and the vehicle is tagged
out for maintenance purposes
(refer to the
section 1.5
“Lockout/
Tagout procedure”).
2.
Start the engine and engage the
hydraulic pump.
3.
Then using the joystick, extend
the automated arm to give a better
access to the hopper area.
4.
If the packer is not fully retracted,
press the yellow button on the
packer control station to retract it.
5.
Turn the hydraulic and the engine
off.
6.
Remove the hopper side panel
(Figure #1.49).
7.
Remove both side rail shields.
8.
Remove the lower bolts (4) of left
side wall to be able to remove the
left side rail (Figure #1.52-53).
FIGURE #1.49
DANGER
APPLY THE LOCKOUT / TAGOUT
PROCEDURE AT ALL TIMES WHEN
MAINTENANCE OR INSPECTION IS
CARRIED OUT ON THE VEHICLE.
Note : The model of the side panel
varies according to the options
installed.
SIDE PANEL
Summary of Contents for Automizer Versa Hand
Page 2: ...AUTOMIZER VERSA HANDTM 1 2...
Page 4: ...AUTOMIZER VERSA HANDTM 1 4...
Page 8: ...AUTOMIZER VERSA HANDTM 1 8...
Page 58: ...AUTOMIZER VERSA HANDTM 1 58 FIGURE 1 81 INPUT OUTPUT COVER ELECTRICAL COILS...
Page 69: ...1 69 GENERAL MAINTENANCE FIGURE 1 89A Strainer Seal...
Page 77: ...1 77 GENERAL MAINTENANCE A B C BEHIN D D F MAIN RELIEF B E...
Page 105: ...1 105 GENERAL MAINTENANCE NOTES...