102
C
HAPTER
3
Maintenance
Figure 162. Main valve
10.
Turn on the speed-up system on
the packer control station (Figure
163. “Right-hand side control
station”)
Note:The engine must be running at
1200 RPM before checking the
pressure (refer to “Pressure
Adjustment Table” on
page 106);
Figure 163. Right-hand side control
station
11.
Activate the crusher panel until
the cylinder reaches the end of
its stroke (Going up);
12.
Adjust the dump valve 3300 PSI
or 2300 PSI (refer to pressure
adjustment table);
13.
Lock the dump valve screw in
place, then the main relief;
14.
Readjust the main relief
according to pressure table in
section 1.15.2;
Main Relief Valve
Adjustment
Speed-Up
(Bunny
Button)
Summary of Contents for expert 2000
Page 1: ......
Page 2: ......
Page 3: ...MAINTENANCE MANUAL 12 14 2006 Part 55379 ...
Page 4: ......
Page 10: ...viii Table of Contents ...
Page 96: ...86 CHAPTER 3 Maintenance Figure 141 Proximity switch front view ...
Page 118: ...108 CHAPTER 3 Maintenance Figure 170 Ball valve in closed position ...
Page 140: ...130 CHAPTER 4 Lubrication PACKER ...
Page 141: ...131 Expert t 2000TM Maintenance Manual BODY CHASSIS HINGES ...
Page 142: ...132 CHAPTER 4 Lubrication HOPPER SECTION STANDARD VERSION ...
Page 143: ...133 Expert t 2000TM Maintenance Manual CRUSHER PANEL ...
Page 144: ...134 CHAPTER 4 Lubrication FULL WIDTH TAILGATE ...
Page 154: ...144 CHAPTER 5 Troubleshooting ...
Page 156: ...146 Appendix CONNECTORS Commonly used Electrical Connectors Deutsch AMP ...
Page 168: ...158 Appendix ...
Page 170: ...160 Appendix ...
Page 171: ......
Page 172: ......