background image

Floor Preparation & Tub Preparation

Determine the location of the bathtub. Carefully lift the bathtub into position so that the drain
hole is off centered about 6" from the waste pipe.  Verify that the tub is level and that legs of

the tub are in contact with the finished floor. Use shims as needed.

LACAVA LLC

3

Installation Instructions/Instrucciones de Instalai

Ó

n

Note:

Solid Surface tubs are extremly heavy

and should be handled with caution.

Use speacilty tools to lift the tub into
place.

CAUTION

HEAVY LOAD

Waste pipe

≈6 1/4"

Reviews: