Floor Preparation & Tub Preparation
Determine the location of the bathtub. Carefully lift the bathtub into position so that the drain
hole is off centered about 6" from the waste pipe. Verify that the tub is level and that legs of
the tub are in contact with the finished floor. Use shims as needed.
LACAVA LLC
3
Installation Instructions/Instrucciones de Instalai
Ó
n
Note:
Solid Surface tubs are extremly heavy
and should be handled with caution.
Use speacilty tools to lift the tub into
place.
CAUTION
HEAVY LOAD
Waste pipe
≈6 1/4"