background image

Lacunza Silver 800/1000 Zero Clearance Box Assembly Instructions

 

June 12, 2022

 

 

 

2.10

 

The holes should line up on The Top Panel, with the Side Panels and Back Panel. Then 

use 5 x Self Tapping Screws for the sides (A total of 10 x Self Tapping Screws) and 3 x Self 

Tapping Screws). If you are installing for the Silva 800, then go to Step 4 before continuing. 

Once the Top Panel is on, tighten all the screws.  

 

 

 

 

 

 

 

 

 

 

2.11

 

You can then add the Back Bracket to the Back Panel. The heater will stop when 

inserted up to the Back Bracket. Use 4 x Self Tapping Screws to attach the Back Bracket. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for SILVER 800

Page 1: ...NJUNCTION WITH THE INSTALLATION MANUAL FOR THE SILVER 800 AND SILVER 1000 MODELS TESTED IN ACCORDANCE WITH AS NZS 4013 2014 and AS NZS 2918 Please read through this manual thoroughly before installing...

Page 2: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 2 Zero Clearance Parts List Check all the parts are supplied before beginning the assembly...

Page 3: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 3...

Page 4: ...de end frames for the stand first For each end you will use 2 x Stand Horizontal Short Brackets and 2 x Stand Vertical Brackets Lay them out as seen in the image below 1 2 Line up the corners by align...

Page 5: ...o be used to fix the frame to the floor Ensure the base is secured to the floor using fixings appropriate for the flooring structure The floor must be able to support the weight of the heater flue and...

Page 6: ...completed Stand The front of the bottom panel should be flat in line with the front stand face 2 2 Flip up the Top Tabs to stop the Bottom Plate from moving around Ensure you do this on both sides the...

Page 7: ...Bottom Panel 2 5 Grab either the RHS LHS Side Panel and slot it into the appropriate sides This is indicated with the circle cut outs on each Side Panel which should be on the bottom side and the thre...

Page 8: ...es and use 9 x Self Tapping Screws Use the circle cut outs in the Back Panel to pull the sheet towards you which should help when you are inserting the Self Tapping Screws Again don t tighten the Self...

Page 9: ...ping Screws for the sides A total of 10 x Self Tapping Screws and 3 x Self Tapping Screws If you are installing for the Silva 800 then go to Step 4 before continuing Once the Top Panel is on tighten a...

Page 10: ...ed hook is fixed to the 300mm Flue Outer Casing You will need 3 x Self Tapping Screws for each Flue Bracket A total of 6 x Self Tapping Screws The 200mm Flue slides through the top of the Zero Clearan...

Page 11: ...ILVER 1000 to SILVER 800 4 1 If you are installing the Silver 1000 then you are completed with assembly If you are installing for the Silver 800 you will need to assemble the 2 x Side Fill Ins before...

Page 12: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 12 Completed Zero Clearance Box with Stand for Lacunza Silver 800 1000...

Page 13: ...be made of a heat resistant material 6 Underside mantle shelf shall be no closer than 550mm from the top of the appliance hot air outlet the mantle shelf shall extend no further than 250mm into the ro...

Page 14: ...istant material 6 Underside mantle shelf shall be no closer than 550mm from the top of the appliance hot air outlet the mantle shelf shall extend no further than 250mm into the room 7 Underside mantle...

Page 15: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 15 Clearance Diagrams Silver 800...

Page 16: ...Lacunza Silver 800 1000 Zero Clearance Box Assembly Instructions June 12 2022 16 Silver 1000...

Reviews: