15
Installation instruction
Place a boiler on the fireproof thermally isolated floor overhung boiler floor plan at least 500mm
on the each side.
It is necessary to keep at least minimum specified safety distances of external boiler outlines and
exhaust pipe from any combustible and medium combustible material in distance min. 800 mm.
Examles of combustibility:
Combustibility grade B: very hardly combustible materials / plasterboard .../
Combustibility grade C1: hardly combustible materials / lignit boards, sawdust boards .../
Combustibility grade C2: medium combustible materials / wood - oak, alder, larch, spruce,
fiberboards .../
Combustibility grade C3: easily combustible materials/ wood- beech, ashen, poplar, fiberboards,
cork, foils, polystyrene, polyethylene, asphald board, celulose materials .../
The boiler is necessary to install in accordance with standards valid in the country of installation.
Safety instructions:
On the boiler and to his safety distance it is prohibited to put any combustible item and materials.
Before you start to work with some changes related the boiler enviroments / manipulation with
combustible materials, etc. / it is necessary to shutdown the boiler and wait till the boiler burns
out. The boiler operation must be according his parameters and the boiler can not be overloaded.
At the ash removing it is necessary to use safety tools /gloves., etc../ to take away and store the
ash in the fireproof tanks.
Attendance instructions
:
The boiler can be operated only by person who is older than 18 years old, mentally and healthy
capable and familiarized with the Manual for operation. During boiler operation it is necessary to
check impeccable boiler state.
Instructions for liquidation of the product after its lifetime:
The product should be liquidated by selling to a scrap-material dealer. The wrapping should be
liquidated in the same way.