38
Step2:
Install PSDR board repaired or completely new spare part and connect related wires,
although some wires are not necessary for charger testing here, but doing it at this section is
in order to be easy for later section testing
10K/10KL
:
Install the bottom PSDR board and connect some cables
20K/20KL
:
Install the INV board
Step3:
Disconnect battery connection with PSDR board,
pack the battery +/- cables
with tape.
10K/10KL
:
Pack the b/- cables with tape
SPS input, unplugged and packed with tape
Lock output L
Bypass, unlock and pack with tape
Disconnect Battery cables and Packed with tape
Battery input terminal
SPS input, unplugged and packed with tape
Plugged
Bypass, unlock and pack with tape
Lock output L/N
Plugged
Summary of Contents for G31 10K
Page 37: ...37 ...