SINGLE 01.06.2019
English / Englisch
COMMISSIONING
Commissioning
This section describes the procedure for commissioning the
SINGLE on site. In order to exclude the possibility of damage and
malfunctions, it is essential to proceed in the sequence outlined
below.
CAUTION!
RISK OF INJURY and RISK OF PROPERTY DAMAGE:
Before working with the machine for the first time, operating
staff must be adequately instructed!
4.1 PREPARING THE MACHINE
ATTENTION!
Please note that the packaging serves as a transport
container for the machine, accessories and the sanding
medium! Furthermore, the machine can be sent back safely
in the original packaging without risk should there be any
problems!
1
Unpack the machine carefully. Please ensure that packaging
materials that are no longer needed are disposed of respon-
sibly, in an environmentally-friendly way.
2
Attach the sanding disc you need to the sanding plate
(
Section 5.3, Changing the sanding disc
).
3
Insert the motor cable in the lower cable holder on the guide
tube (fig. 4).
4
Pull the adjusting lever on the handle towards you to release
the lock of the guide tube (fig. 5, 1). Push the guide tube into
and past the vertical position until it reaches the mechanical
stop (fig. 5, 2).
Fig. 4
Insert the motor cable in the lower cable holder
on the guide tube.
Fig. 5
Pull the adjusting lever to release the lock (1)
and push the guide tube up until it reaches the
mechanical stop (2).
Fig. 6
Release the adjusting lever (1) and carefully tilt
the machine backwards. Steady the machine with
your foot to stop it rolling away (2) and
ensure that
the machine is stable!
4
Single
22
11
!
22
11
18