5. MACHINE MAINTAINESS
39
Cleaning & Checking Schedule
Check items
Daily
Weekly
Monthly
3-month
6-month
yearly
Check emergency stop and
indicate lamp whether normal
or not?
Check the integrity of noise,
pressure and ventilation of the
machine.
Clean the exterior part of the
machine
Check all the screws from the
machine whether tight or not?
Check screws and nuts of limit
switch whether tight or not?
Check all wires and electric
connections near the power
switch to see if there have any
Check belt running normal or
not? If any break or failure,
replace it.
Check the load voltage and
current of the motor
Check the continuity of all the
wires
Clean the interior part of the
electrical box and check the
continuity of the wires.
Tighten the terminal screws of
the power supply wires in the
control box
Any worn or damaged parts
and unsafe condition.
Clean & vacuum dust buildup
from inside cabinet.
Summary of Contents for P12 10
Page 26: ...3 INSTALLATION 22 Figure 3 10 2 D C ...
Page 52: ......
Page 53: ......
Page 54: ...MPSP12 10 0135 ASSEM 1 1 23 1 ...
Page 58: ...MPSP12 10 0135 ASSEM 1 2 4 5 ...
Page 60: ...MPSP12 10 0135 ASSEM 3 1 5 7 ...
Page 63: ...MPSP12 10 0135 ASSEM 3 2 6 10 ...
Page 65: ...MPSP12 10 0135 ASSEM 3 3 5 12 ...
Page 67: ...MPSP12 10 0135 ASSEM 4 10 14 ...
Page 69: ...MPSP12 10 0135 ASSEM 5 7 16 ...
Page 72: ...MPSP12 10 0135 ASSEM 6 1 19 ...
Page 74: ...MPSP12 10 0135 ASSEM 6 2 21 ...
Page 76: ...MPSP12 10 0135 ASSEM 6 3 23 ...
Page 78: ...MPSP12 10 0135 ASSEM 7 6 3200mm 25 ...
Page 80: ...MPSP12 10 0135 ASSEM 8 1 27 ...
Page 82: ...MPSP12 10 0135 ASSEM 9 3 29 ...
Page 85: ...MPSP12 10 0135 ASSEM 10 3 32 ...
Page 89: ...MPSP12 10 0135 ASSEM 12 6 4 36 ...
Page 92: ...MPSP12 10 0135 ASSEM 12 10 39 ...