Page | 8
MACHINE INSTALLATION AND INSPECTION
When installing and inspecting
Color Match
, be very careful of the following points and pay
attention to ensure that the players can enjoy the game safely.
Be sure to turn the power
OFF
before working on the machine.
Make sure the power cord is not exposed on the surface (floor, ground, etc.) where people walk.
Check that the rubber glide feet levelers are set correctly on the floor so that the game cabinet is
level and stable.
Always make complete connections for the integrated circuit (IC) logic PC Boards and other
connectors. Insufficient insertion can damage the electrical components.
Only qualified personnel should inspect or test the integrated circuit (IC) logic PC Boards.
If any integrated circuit (IC) logic PC Boards should need servicing, please contact the nearest
LAI
Games
Distributor. (Refer to the back page of this manual)
* CAUTION! *
Before
Switching the machine on be sure to check that it has been set on the correct
voltage for your area!
Refer
To the mains voltage adjustment section of this manual. Machines are normally
shipped on 220V AC unless otherwise specified.
* WARNING! *
Always
Turn
OFF
mains power before removing safety covers and refit all safety covers
when work is completed.
Summary of Contents for Color Match
Page 1: ...LAI Games OPERATORS MANUAL Version 11 COLOR MATCH Software Version 1 11...
Page 48: ...Page 48 COLOR MATCH WIRING DIAGRAMS...
Page 49: ...Page 49...
Page 50: ...Page 50...
Page 51: ...Page 51...
Page 52: ...Page 52...
Page 53: ...Page 53...
Page 54: ...Page 54...
Page 55: ...Page 55...