background image

17

Installation Operations and Maintanence

Separator Model:____________________________________

Sales Order #:_______________________________________

Purchase Date:______________________________________

Distributor:_________________________________________

System Flow:_____________________ 

Separator Delta P:_________________

NOTES:

1365 N. Clovis Avenue

Fresno, California 93727

(559) 255-1601

www.lakos.com

Summary of Contents for HTH Series

Page 1: ...LS 714B Rev 11 17 1365 N Clovis Avenue Fresno California 93727 559 255 1601 www lakos com HTX HTH SEPARATORS I O MANUAL INSTALLATION OPERATIONS AND MAINTENANCE ...

Page 2: ...nciple of Operation Page 3 Operation Installation Page 3 4 Recommended Piping Page 4 Maintenance Purging Page 5 Maintenance Recommendations Page 6 Trouble Shooting Page 7 9 HTH Flow vs Pressure Loss Chart Page 10 HTX Flow vs Pressure Loss Chart Page 10 Spare Parts Page 11 16 Notes Page 17 ...

Page 3: ...1 LAKOS Separators are shipped on skids or in wooden crates Support legs 22 low profiles only are detached Lifting Lugs located on the unit s side and or flanges are provided for hoisting as necessary 2 A suitable foundation is necessary to accommodate the LAKOS Separator s weight including liquid Anchor bolts are recommended in the base of the legs low profile or skirt vertical profile 3 Prior to...

Page 4: ...s important if the LAKOS Separator is to remain idle in freezing temperatures Drain liquid as necessary to avoid expansion of water to ice and related damage Grooved couplings are not included with the separator Optional flanged connections are available upon request 7 Inlet pressure to the LAKOS Separator must be at least equal to or greater than the anticipated pressure loss through the separato...

Page 5: ...llected into a separate collection bag Once the bag is full with solids the bag is emptied The bag can be cleaned and reused or simply replaced Consult your LAKOS representative for details on the solids recovery vessel and accessories 3 HTX HTH Separators feature standard purge outlets Prior to start up the installation of a manual valve on the purge is recommended so that this outlet may be serv...

Page 6: ...Hole Gasket inspected for leaks and change as necessary Separator Slots should be inspected during facility pipe inspection is required Inspection of slots is recommended when separator performance is suspect Slots should be checked for obstruction and wear Note Visual inspection of the separator should be conducted once a month Visual inspection should also include observing the inlet and outlet ...

Page 7: ... Pressure Actual inlet pressure must be at least 15 psi 1 03 Bar A minimum back pressure of 5 psi 34 Bar must be created at the separator discharge This may be accomplished via process equipment piping or a valve Unrestricted open discharge to a pit sump etc will result in unacceptable performance Be sure that no source of vacuum suction exists in the piping arrangement If vacuum suction exist i e...

Page 8: ... duration proper duration is the time it takes fluid to come out clean in order to pass all accumulated solids through the full length of the purge piping Continuous purge bleed piping must be sized properly Oversized piping will allow purged solids to settle in the line and result in plugging Under sized piping will unduly restrict the flow and will result in plugging Purge flow must not exceed 1...

Page 9: ...s devices should also be properly re sealed after use 10 Air Relief Ports The appropriate air relief ports should be used at start up to expel air from the separator If the separator will be drained periodically or exposed to entrained air or gases from the piping system air vents should be permanently installed 11 Down Stream Filtration The use of finer filtration polishing downstream from the se...

Page 10: ...2 4 6 8 1 0 Pressure Loss bar 3 5 7 9 10 15 20 25 50 75 100 150 200 250 500 750 1 000 1 500 2 000 2 500 3 000 Flow Rate m3 hr Pressure Loss psi 3 5 10 12 Flow Rate U S gpm 20 30 40 50 100 10 000 5 000 3 000 2 000 1 000 500 300 200 HTH 0285 HTH 0450 HTH 0500 HTH 0810 HTH 1275 HTH 1950 HTH 3500 HTH 6700 G A B C D E F G H A B C D E F H 50 2 4 8 1 0 6 Flow Rate m3 hr 75 100 150 350 500 1 0002 000 12 2...

Page 11: ... DIAMETER FACE GLYCERINE FILLED PART DESC Description 2 Description 3 Description 4 118504 GROMMET STRIP 15 16 x 1 4 EPDM 11 LG 116443 GASKET COUPLING 5 TYPE E GROOVE EPDM 118512 GKT KIT GAUGE 160PSI CARBON STEEL 106263 GAUGE 160 PSI 1 4 MNPT BOTTOM 2 1 2 DIAMETER FACE GLYCERINE FILLED PART DESC Description 2 Description 3 Description 4 118504 GROMMET STRIP 15 16 x 1 4 EPDM 7 3 8 LG 106141 GASKET ...

Page 12: ...IAMETER FACE GLYCERINE FILLED PART DESC Description 2 Description 3 Description 4 118504 GROMMET STRIP 15 16 x 1 4 EPDM 19 15 16 LG 106147 GASKET COUPLING 8 TYPE E GROOVE EPDM 118512 GKT KIT GAUGE 160PSI CARBON STEEL 106263 GAUGE 160 PSI 1 4 MNPT BOTTOM 2 1 2 DIAMETER FACE GLYCERINE FILLED PART DESC Description 2 Description 3 Description 4 118504 GROMMET STRIP 15 16 x 1 4 EPDM 16 11 16 LG 106147 ...

Page 13: ...IAMETER FACE GLYCERINE FILLED PART DESC Description 2 Description 3 Description 4 118504 GROMMET STRIP 15 16 x 1 4 EPDM 27 1 16 LG 106150 GASKET COUPLING 12 TYPE E GROOVE EPDM 106205 GASKET HANDHOLE 4 x 6 NEOPRENE 118512 GKT 160 PSI 1 4 MNPT BOTTOM 2 1 2 DIAMETER FACE GLYCERINE FILLED PART DESC Description 2 Description 3 Description 4 118504 GROMMET STRIP 15 16 x 1 4 EPDM 26 5 16 LG 106149 GASKET...

Page 14: ...RINE FILLED PART DESC Description 2 Description 3 Description 4 118504 GROMMET STRIP 15 16 x 1 4 EPDM 50 1 4 LG 119488 GASKET COUPLING 20 TYPE E GROOVE EPDM 106205 GASKET HANDHOLE 4 x 6 NEOPRENE 118512 GKT KIT GAUGE 160PSI CARBON STEEL 106263 GAUGE 160 PSI 1 4 MNPT BOTTOM 2 1 2 DIAMETER FACE GLYCERINE FILLED PART DESC Description 2 Description 3 Description 4 118504 GROMMET STRIP 15 16 x 1 4 EPDM ...

Page 15: ... 2 DIAMETER FACE GLYCERINE FILLED PART DESC Description 2 Description 3 Description 4 119685 GASKET ANSI 12 HTX 28 150 1 8 THK NEOPRENE 106205 GASKET HANDHOLE 4 x 6 NEOPRENE 118512 GKT KIT GAUGE 160PSI CARBON STEEL 106263 GAUGE 160 PSI 1 4 MNPT BOTTOM 2 1 2 DIAMETER FACE GLYCERINE FILLED PART DESC Description 2 Description 3 Description 4 118504 GROMMET STRIP 15 16 x 1 4 EPDM 33 3 8 LG 116634 GASK...

Page 16: ...ENE 106205 GASKET HANDHOLE 4 x 6 NEOPRENE 118512 GKT KIT GAUGE 160PSI CARBON STEEL 106263 GAUGE 160 PSI 1 4 MNPT BOTTOM 2 1 2 DIAMETER FACE GLYCERINE FILLED PART DESC Description 2 Description 3 Description 4 120437 GASKET ANSI 20 HTX 42 150 1 8 THK NEOPRENE 106205 GASKET HANDHOLE 4 x 6 NEOPRENE 118512 GKT KIT GAUGE 160PSI CARBON STEEL 106263 GAUGE 160 PSI 1 4 MNPT BOTTOM 2 1 2 DIAMETER FACE GLYCE...

Page 17: ...s Order _______________________________________ Purchase Date ______________________________________ Distributor _________________________________________ System Flow _____________________ Separator Delta P _________________ NOTES 1365 N Clovis Avenue Fresno California 93727 559 255 1601 www lakos com ...