Printed 07-2001
-10-
Form No. M1-0002
34
REFER TO DRAWING FOR CORRECT POSITION OF ALL PARTS
1.
Insert front tie rod (38) with nuts, into formed section of hamper bottom tube (43). Formed section facing
in.
2.
Place flat, formed end of dump handle (31) on L.H. end of tie rod.
3.
Locate two small bent front hamper tubes (32). Place “short” end on tie rod and secure (not tight) with nuts
(19).
4.
Insert hamper back tube (44) into bottom tubes (43). Place cross tube (47) on top, align holes and secure
with bolt (48) and nut (19), curved formed end pointing up.
5.
Install hamper top tubes (45) over reduced ends of back tubes (44). Place cross tubes (47) on top and align
holes and secure with bolts (48) and nuts (19). Curved formed ends should point down.
6.
Assemble center tie rod (35) as shown, longer threaded end to dump tube side. Rod goes through washer
(21), dumping tube (31), top tube (45) and corner tube (32) and fasten with nut (19).
7.
Slide hamper latches (36) on tie rod as shown, hooks facing to the center. Install spacer (50), washer (21)
and place end through tubes (45) and (32), fasten with nut (19).
CONTINUED ON NEXT PAGE
34
47
44
44
45
47
19
19
45
19
32
21
31
50
36
43
38
21
33
33
32
36
35
48
43
34
47
44
44
45
47
19
19
45
19
32
21
31
50
36
43
38
21
33
33
32
19
36
35
48
43