background image

25

GB

• Installation in boiler

Place of installation

The room where the boiler and burner are installed must have openings to the outside as required by 

current regulations. If there are several burners or exhausters that can work together in the same room, 

the ventilation openings must be sized for simultaneonus operation of all the units.

The place of installation must be free of flammable materials or objects, corrosive gases, dusts or vo

-

latile substances which, drawn by the fan, can obstruct yhe pipes inside the burner or the combustion 

head. The room must be dry and not exposed to rain, snow or frost.

Fix the burner to the door. Make the electrical connections as described in section (wiring diagram).

Insert the temperature probe (contained in the kit) in the sheating on the cast-iron boiler shell and make 

the respective electrical connections.

THE BURNER IS DESIGNED TO WORK ON HEAT GENERATORS WITH COMBUSTION CHAMBER 

IN NEGATIVA PRESSURE.

THE  PELLET  CONTAINER  MUST  BE  POSITIONED  SO  THAT  THE AUGER/BURNER  FLEXIBLE 

CONNECTION TUBE IS NOT TWISTED AND/OR BENT.

Fixing to the boiler

Fig.4

Summary of Contents for ECO 5.5 P

Page 1: ...01 PROIZVOD SA SERTIFIKATOM ISO 9001 UNI EN ISO 9001 ECO 3 4 P ECO 5 5 P Bruciatore a pellet Pellet burner Plamenik na pelete Gorionik na pelete Libretto uso e manutenzione Installation and maintenanc...

Page 2: ...Installation and maintenance must be carried out by professionaly qualified personnel in compilance with current regulations and the manufaturer s instructions Incorrect installation or poor maintena...

Page 3: ...internal clock or contact C Burner management Second internal clock or contact OPERATING INSTRUCTIONS Fig 1 Control panel Fig 1 Method A Methods B and C 1 Day time setting button 2 Operation mode sel...

Page 4: ...the unit During the first 10 seconds the display shows The software version of the user interface and the controller fig 3 A nOCU fig 5 may appear for a couple of seconds fig 3 B C Adjustements Settig...

Page 5: ...not show the ON icon or CLOCK icon The bur ner is off The set weekly programme is by passed Preset factory set weekly programme 06 30 08 30 12 00 12 00 16 30 22 30 The weekly programme is present with...

Page 6: ...5 8 1 Use the and buttons part 4 e 6 fig 1 to modify the start of the 3rd ON time band example 16 00 Press the Programming button P detail 5 fig 1 9 22 30 on Radiator flash 6 9 1 Use the and buttons p...

Page 7: ...c 8 8 t05 Adjustment calculation timer only with Modulating burner operation with delivery Probe 0 100 seconds 5 seconds 5 seconds t06 Ramp function timer 0 100 seconds 100 seconds 100 seconds t07 Per...

Page 8: ...off operation It is necessary to set the maximum power of the burner as a function of the boiler s power see table 3 Table 3 General instructions This unit must only be used for its inteded purpose Th...

Page 9: ...tile substances which drawn by the fan can obstruct yhe pipes inside the burner or the combustion head The room must be dry and not exposed to rain snow or frost Fix the burner to the door Make the el...

Page 10: ...mage caused by failure to earth the system Also make sure the electrical system is adequate for the maximun power absobed by the unit as specified on the boiler dataplate Make sure torespect the polar...

Page 11: ...d attempt was not sufficient repeat the previous sequence from point 4 to start the third and last attempt 9 In order to do another 3 attempts switch the power to the unit off and then on again 10 Aft...

Page 12: ...in the boiler with the preliminary settings indicated above Make sure the boiler and system are filled with water or diathermic oil the plumbing circuit valves are open and that the flue is free and...

Page 13: ...r at least 10 minutes operation and check of correct setting Opening of casing and burner disassembly Before carrying out any checking oe cleaning inside the burner disconnect the power to the burner...

Page 14: ...tainer empty auger cable broken or disconnec ted faulty igniter resistance combustion head dirty pellet feed duct blocked fill the container with pellets restore the connection replace and empty the h...

Page 15: ...nnectly plug 5 User interface 7 Photoresistance General view and main components 8 Thermostat 85 C 9 Burner loading tube 10 Motor 11 Fan 12 Nozzle 13 Griglia 60 4 5 A B C D E F G H L M A B C D E F G H...

Page 16: ...el delivery kg h 2 9 6 3 Electrical protection rating IP X0D X0D Power voltage frequency V Hz 230 50 230 50 Electrical absorption motor W 50 70 Igniter rated power W 300 300 Empty weight kg 11 19 Hopp...

Page 17: ...33 GB FR IU MB TST CA CM PA PS SB STR TC Important Before connecting the rquest contact remove the jumper on the connection plug...

Page 18: ...359947 The illustrations and data given are indicative and not binding Lamborghini Calor reserves the right to make all modifications it deems appropriate for improvement of the product without forew...

Reviews: