The length of the cables used must allow the burner and any boiler door to be opened.The electric connections
must be made exclusively by qualified staff and the regulations in force on the subject of electricity must be re-
spected.
After all packaging material has been removed, control the contents and ensure that these have not been damaged
in any way during transport.If in doubt, do not use the burner and contact the supplier.
The packaging materials (wooden cages, cardboard, plastic bags, expanded materials, staples, etc...) represent
a form of pollution and potential risk if left everywhere. Collect them and dispose of them in a suitable manner (in
a suitable place).
DESCRIPTION
They are gas burners with gas/air mixture at the combustion head, with reduced flow rate start-up. The conformation
of the carburisation head allows the use of all natural, mixed and liquid gases (consult the technical after-sales staff
for specific information); the gas/air mixture allows to obtain combustion with low excess air, for high combustion
yields and low emissions of CO and NOx for protection of the environment.
They are suitable for pressurised and low pressure areas, according to the relative work curves. The gas ramp
can be installed on the left or on the right.Inspection can be performed easily and completely through the hinged
opening envisioned between body and burner head, without removing the connection to the gas line.
Automatic functioning with ionisation probe flame control.The burners are envisioned with different sized valves,
to be selected in relation to the gas flow rate requested and the gas pressure (and boiler) available