14
GB
BOILER ASSEMBLY
The burner is fixed by the flange, placing the supplied insulated gasket between the plate and the boiler. For drilling
of the boiler and positioning of the fastening screws, refer to the diagram.
pG
pL
pF
L
Fm
FM
M
D
Insulating gasket
L = Useful entrance lenght flow nozzle
L (BC) = flame tube short
L (BL) = flame tube long
M
D
L
(BC)
L
(BL)
FM
F
m
M
mm
mm
mm
mm
mm
M
sCrew
G 700
166
235
325
286
246
M12
G 1000
196
230
310
286
246
M12
The system must be complete with the accessories prescribed by the Standards: do not exert mechanical stress
on the components.
Also, keep the spaces requested for maintenance of the burner and boiler in mind.
On request, it is possible to order the ACCESSORIES UNIT KIT, composed of the anti-vibration joint and gas ball
cock.
GAS CONNECTION
M