4. INSTALLATION WORKS
4.1. Before installation
Pipe assemblies for the installation of the Lämpöässä system may only be
installed by qualified and trained persons. The equipment must be installed
in compliance with instructions provided; after performance of installation
works, the installation checklist must be reviewed in order to minimise
potential errors. The manufacturer shall not be responsible for any equip
-
ment defects or related expenses caused through installation faults.
Check that:
•
all the necessary hoses and sensors have been delivered
•
the ground source heat pump has been correctly fitted
•
the connections on top of the geothermal heat pump are intact
•
the fuse size is correct for the master fuse and the ground source
heat pump (see technical specifications)
•
the ground circuit collection piping and supply piping have been
installed properly
4.1.1. Transport
The Lämpöässä geothermal heat pump must always be transported in a
vertical position. If tilting the equipment is unavoidable, for example, to
pass through a doorway, the maximum tilting angle allowed is 45°. In
other cases, the machine’s compressor unit must be detached during tilt
-
ing.
T
he equipment may be moved from beneath using a fork lift, for
example. Do not go underneath the
equipment while it is being lifted!
A transportation platform has been
fastened on both sides of the
ground source heat pump using
screws. The ground source heat
pump’s accessory package includes
adjustable feet to be screwed into
the unit bottom (see picture). After
that, remove the wooden platform elements and their fixation screws (4
pc). To remove the platform, lift the equipment by a fork lift, for
example.
4.1.2. Ground source heat pump installation area
We recommend that the Lämpöässä ground source heat pump be installed
in a warm room with floor drain. During installation, when filling the
ground circuit, some water/ethanol or water/glycol mixture may be
splashed onto the floor. The chosen area does not have to be fireproof.
Approx. 30 cm of installation space should be reserved above the
equipment.
The floor must be able to withstand the weight of the ground source heat
pump carrying a full storage tank (= own 500 kg). The floor
must also be sufficiently even, because the ground source heat pump
must be installed as level as possible. Final adjustments can be made
using the adjustable underneath the equipment.
4.1.3. Removing the packaging
Remove the plastic wrapping and corner padding from around the prod
-
uct. Check that the pump has not suffered any transportation damage. If
the heat pump is found to be damaged, the transport company must be
immediately notified.
Also check the contents of the delivery immediately. The Lämpöässä Vmi
series accessory package includes the following components:
•
flexible ground circuit hose (approx. 600 mm) – 2 pc.
•
outdoor sensor
•
adjustable foot (4 pc.)
•
shut-off valve 1”
If some of the accessories specified in the order are not included in the
delivery, notify the equipment dealer within five days.
INSTALLER MANUAL
Summary of Contents for VMI 6-17
Page 1: ...L MP SS Vmi 6 17 L MP SS 3 2016 INSTRUCTIONS FOR USE INSTALLATION AND MAINTENANCE...
Page 31: ...XL 2015 811 2013 A A A B C D E F G A A A B C D E F G Vmi 6 38 dB 00 dB 8 kW 8 kW 8 kW...
Page 32: ...A A A A A A A A B C D E F G A A A A B C D E F G XL 2015 811 2013 XL X Vmi 6...
Page 35: ...XL 2015 811 2013 A A A B C D E F G A A A B C D E F G Vmi 9 41 dB 00 dB 10 kW 10 kW 10 kW...
Page 36: ...A A A A A A A A B C D E F G A A A A B C D E F G XL 2015 811 2013 XL X Vmi 9...
Page 39: ...XL 2015 811 2013 A A A B C D E F G A A A B C D E F G Vmi 11 36 dB 00 dB 11 kW 11 kW 11 kW...
Page 40: ...A A A A A A A A B C D E F G A A A A B C D E F G XL 2015 811 2013 XL X Vmi 11...
Page 44: ...A A A A A A A A B C D E F G A A A A B C D E F G XL 2015 811 2013 XL X Vmi 11 1x230V...
Page 47: ...XL 2015 811 2013 A A A B C D E F G A A A B C D E F G Vmi 14 38 dB 00 dB 14 kW 14 kW 14 kW...
Page 48: ...A A A A A A A A B C D E F G A A A A B C D E F G XL 2015 811 2013 XL X Vmi 14...
Page 52: ...A A A A A A A A B C D E F G A A A A B C D E F G XL 2015 811 2013 XL X Vmi 14 1x230V...
Page 55: ...XL 2015 811 2013 A A A B C D E F G A A A B C D E F G Vmi 17 42 dB 00 dB 17 kW 17 kW 17 kW...
Page 56: ...A A A A A A A A B C D E F G A A A A B C D E F G XL 2015 811 2013 XL X Vmi 17...
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......