QUESTIONS?... Contact Customer Service at 1-888-370-6531 M-F 8:00 am- 4:15 pm CST
14
Section 3 - Heater Installation
TYPICAL INSTALLATION:
HEATER/CHIMNEY PACKAGE
Ceiling-Mount Through-the-Roof
1.
Double-Wall Chimney Flue (Class A)
2.
Roof Penetration
3.
Single-Wall Chimney Flue
4.
Barometric Damper & Tee
5.
Ceiling-Mounted Heater Unit
6.
Burner
7.
Secondary Air Regulator
8.
Oil-Bypass Pressure Regulator
9.
Ceiling-Mount Support Rods
(not included)
10.
Primary
Strainer
11.
Fill Pipe (for priming)
12.
Fuel Pump
13.
Fuel-Pickup Assembly (in tank)
14.
Tank Drain
Compressed-air
supply,
electrical
shutoff
switch,
tank
vent,
and
additional
chimney
material
not
included.
Installation
configurations vary. Additional materials will be necessary.
Contact Lanair for Assistance with special circumstances.
Heater must be hung at least 8 ft.
above the floor
If the heater is not installed on a
tank stand supplied by Lanair, a
metering pump may be desired in
order to eliminate the need to adjust
oil flow from a distance
Use 1/2” O.D. soft copper fuel line
from pump to burner
(3/8” O.D. with metering pump)
Keep at least 3 ft. to barometric
damper from any fan, air source/
return, etc.
Use 3/8”-16 TPI threaded rod (not
included) to hang the heater from
load-bearing structure
13
9
10
11
7
12
14
1
2
3
4
5
6
8