7
THIS MANUAL APPLIES TO THE FOLLOWING UNITS
PRE-INSTALLATION CHECKLIST
POST MIX ACCESSORIES:
CO
2
Regulator
CO
2
Supply
Chain for CO
2
Tank
Beverage Dispenser
Beverage Tubing
Oetiker Clamp Fittings
Water Booster (Lancer PN:
82-3401 or MC-163172
Water Regulator (recommended)
Remote Cooling/Carbonation
System
CONSIDER THE FOLLOWING
BEFORE INSTALLATION:
Location of Water Supply Lines
Location of Drain
Location of Electrical Outlet
Location of Heating and Air
Conditioning Ducts
Do you have enough space to
install the dispenser and junction
box?
Is countertop level?
Is countertop at least 1 inch
thick?
TOOLS REQUIRED:
Oetiker Pliers
Tubing Cutters
Wrench
Slotted Screwdriver
Phillips Screwdriver
Drill
BIB SYSTEM:
BIB Rack
BIB Syrup Boxes
BIB Regulator Set
BIB Connectors
PART NUMBER
DESCRIPTION
85-3151R-21-11111-00
TOWER, UNICORN, RECIRC, TC, PC, CC, VV-R, GI
85-3151R-21-11111
TOWER, UNICORN, RECIRC, TC, PC, CC, VV-R
85-3151R-20-11111-22
TOWER, UNICORN, TC, PC, CC, VV-R, AUS
85-3161R-21-11111
TOWER, UNICORN, TC, PC, CC, LFCV-R
85-3161R-21-11111-00
TOWER, UNICORN, TC, PC, CC, LFCV-R, GI
85-3161R-21-21222
TOWER, UNICORN, RECIRC, TC, PC, GB.LFCV-R
85-3161R-21-21222-00
TOWER, UNICORN, RECIRC, TC, PC, GB.LFCV-R, GI
85-3161R-21-23222
TOWER, UNICORN, RECIRC, TC, NOPC, GB, LFCV-R*
85-3161R-21-23222-00
TOWER, UNICORN, RECIRC, TC, NOPC, GB, LFCV-R, GI*
85-3161R-21-31332
TOWER, UNICORN, RECIRC, TC, PC, PI, LFCV-R
85-3161R-21-31332-00
TOWER, UNICORN, RECIRC, TC, PC, PI, LFCV-R, GI
85-3161R-20-31332-22
TOWER, UNICORN, RECIRC, T/C, PC, PI, LFCV-R, AUS
85-3161R-12-2204
TOWER, UNICORN, RECIRC,T/C, LFCV,SINGLE
KEY
TC – Thru Counter
PC – Portion Control
NOPC – Non Portion Control (*Self serve)
R – Recirculation (RECIRC)
AUS – Australia
GI – No Transformer (International Only)
VV – Uses Volumetric valves
LFCV – Uses LFCV valves
SINGLE – Single Brand Tower
Summary of Contents for 85-3151R-20-11111-22
Page 27: ...27 Wiring Diagram LFCV...
Page 28: ...28 Wiring Diagram VV...
Page 29: ...29 Counter Cutout Not to Scale...