7
Installing an Icemaker (if necessary)
When installing an icemaker on the dispenser, use a
bin thermostat to control the ice level (see below). This
will prevent damage to the dispensing mechanism. The
bracket for mounting a thermostat is located in the ice
bin. During the automatic agitation cycle and while
dispensing ice, ensure there is adequate space
between the top of the ice level and the bottom of the
icemaker so the ice can move without obstruction.
Contact your icemaker manufacturer for information on
a suitable bin thermostat.
!
ATTENTION
Failure to use an ice bin thermostat will not only void
your IBD’s warranty but will result in the inability to
control the level of ice in the ice bin which can cause
damage to your dispenser.
!
ATTENTION
1. Install the icemaker per manufacturer specifications. Points
of consideration include drainage, ventilation, and drop
zones.
2. An adapter plate is required when installing an icemaker.
Contact your Sales Representative or Lancer Customer
Service for more information.
3. A bin thermostat is required in order to control the level of
ice in the dispenser (Refer to ATTENTION). Contact your
icemaker manufacturer to obtain the correct bin thermostat.
4. Bin thermostat should be a minimum of 2” below the top
edge of the dispenser. The preferred location of the bin
thermostat is on the right side wall.
5. Ensure the icemaker is installed properly to allow for removal
of the Merchandiser.
6. Ensure manual fill is accessible.
7. Clean and maintain icemaker per manufacturer’s instructions.
If installing a Scotsman
®
Pellet icemaker, Lancer
recommends setting the auto agitation time to every
60 minutes. To adjust the agitation time, set the dip
switches located in the control box behind the
merchandiser. See the DIP Switch Legend diagram on
page 31
of this manual for reference.
NOTE
4”
Attach Bin Stat Bracket As Shown
Recommended Bin Stat Attachment
Bulb
Tube
Dispenser Installation
1. To remove the merchandiser, first detach the left and right
side from the connection tabs behind the merchandiser, by
pulling away from the unit.
The installation, and relocation if necessary, must
be carried out by qualified personnel with up-to-date
knowledge and practical experience, in accordance
with current regulations.
NOTE
2. Rotate the merchandiser, away from the unit, from the
bottom then lift the merchandiser straight up to detach from
the top of the ice bin and remove from the unit.
3. Twist/Rotate the ADA panel, located on the unit’s splash
plate, in a counterclockwise direction up to a 45° angle.
4. Carefully pull ADA panel and electric wire harness from the
unit’s splash plate, until the harness connector is visible.
5. Disconnect ADA harness and remove from the unit. Repeat
Steps 3-4 for second ADA panel.
6. Remove the splash plate and drip tray.
7. Route appropriate tubing from the water source to the water
inlet at the remote pump deck.
8. If necessary, install water booster (Lancer PN MC-163172)
between water supply and the remote pump deck.
A
B
A. Merchandiser
B. Splash Plate