Page 36
Operation On - Off
Deadly risk!
Do not operate the equipment with damp hands!
Take caution with live components!
Risk of injury!
Take caution with heated components!
Connection equipment pneumatics
• Switch off operating voltage!
• Close
shut-off valve (6)
.
• Establish pneumatic connection to pressurised air consumers (
12
).
Normal mode
• Plug in power connection cable (
11
).
• Connect monitoring lines (
13
).
• Switch on motor protective switch (
43
).
• Wait until the equipment is charged.
- The compressor switches off at 5.0 bar.
• Open
shut-off valve (6)
,
43
- the compressor automatically switches on and off
when reaching the lower and upper pressure values.
Shut down operation
• Turn off motor protective switch (
43
).
• Plug out power connection cable (
11
).
• Depressurise equipment!
- Open all pneumatic connections
for
cable pressure
for this.
12
13
11
• Remove connecting hoses from the equipment output (
12
).
• De-connect monitoring lines (
13
).
• If necessary, branch off electrical connections.
Summary of Contents for RTS 1000
Page 15: ...Page 15 39 35 37 36 36 23 42 28 27 24 6 33 38 40 41 32 22 29 25 8...
Page 21: ...Page 21...
Page 47: ...Page 47 7 16 14 15 15 18 17 13 20 24 8 23 10 6 9 4 22 21 19 8...
Page 51: ...Page 51 Pneumatics diagram Nr 074891 000...
Page 53: ...Page 53 Circuit diagram Nr 074880 000...