Section 5: Maintenance & Lubrication
RC5615, RC6615, RCM5615, & RCM6615 Series 2 S/N Rotary Cutters 330-323M
5/6/20
58
CV Main Driveline Joints & Shields
Type of Lubrication: Multi-purpose Grease
For instructions on how to access grease zerks shown
in Figure 5-16, see
“Accessing CV Driveline Joints”
•
The constant velocity joint should be greased in a
straight position forcing grease through the passages
and into the cavity. After lubrication, grease should
be visible around the ball joints.
•
Grease fittings located on the u
-
joints and driveline
shields should be lubricated every 8 hours of
operation.
IMPORTANT:
To extend the life of the constant
velocity joint, extensive lubrication must be
performed every 8 hours of operation.
IMPORTANT:
Attach safety chain (#1) to tractor
frame. Attach safety chain (#2) to cutter frame.
CV Main Driveline Profile Tubes
Type of Lubrication: Multi-purpose Grease
Quantity = Coat Generously
IMPORTANT:
To extend the life of the constant
velocity joint, extensive lubrication must be
performed every 8 hours of operation.
8
Hours
8
Hours
Figure 5-15
Figure 5-16
Driveline with internal grease point for profile tube
23565
Zerk Located on end of tube
23556
8-10 pumps
Drivelines with external grease point for profile tube
8-10 pumps
CV Driveline with overrunning clutch
39280
23565
Access Zerk through hole in shield
Drivelines with internal grease point for profile tub
Drivelines with external grease point for profile tub
23556
4-5 pumps
2-3 pumps
2-3 pumps
4-6 pumps
4-5 pumps
2-3 pumps
4-6 pumps
2-3 pumps
CV Driveline with overrunning clutch
2
1