Installation
Assembly
12
2.4.
Assembly
1. On both sides: The M10x165 and M10x180 Hex Head Bolts used
to secure the Upright to the Frame are shipped in the Frame, held
in place during shipment with 16mm nuts. Remove and discard the
nuts and allow bolts to slide down and rest on the floor
(Figure 2-10).
Figure 2-10. Bolt Shipping Position
2. Untie wire tie from the Upright and leave wire in place. You will
need this to guide the Upper Wire Harness through the Upright
Upper Access Hole later.
3. Align the pins on the bottom of the Upright Plate with the holes in
the Frame and lower the Upright fully onto the Frame (Figure 2-11).
M10x180 Hex Head Bolt
M16 Nut (4X)
Remove and
discard
M10x165 Hex Head Bolt