3-4
F-632-1218
ASSEMBLY INSTRUCTIONS
Hitch Assembly
IMPORTANT
Read all safety precautions at the front of the section
before attempting any of the following procedures.
WARNING
1.
Connect hitch to the center frame ears using hitch
pin, machine bushings, and 5/16 x 2-1/2 slotted
spring pin
2.
Install the tongue jack in the forward mounting tube
and rotate to parking position to support the front of
the hitch.
3.
Insert a 3/4-10 x 7 hex head cap screw into the hose
holder tube on the hitch from the bottom side so the
threads point upward. Hold in place with a 3/4
prevailing torque flange nut with the flange pointing
upward as well. Do not tighten this cap screw, so the
hose holder bracket may pivot freely in this joint.
4.
Slide the hose holder bracket over the screw and
secure with another 3/4 prevailing torque flange nut.
5.
Install a 3/8-16 x 3-1/2 all-thread screw in the front of
the hose holder bracket and secure with a 3/8-16 hex
nut.
6.
Slide the hose holder clamp over the 3/8” screw and
loosely start the wing nut on top of the clamp.
Hydraulic hoses will be routed through the clamp
after assembly.
NOTE
The clamp has two sides, so that extend hoses can be
located on one side and retract hoses can be located on
the other side for reference.
7.
Loosely install 1/2-13 x 2-1/2 hex head cap screws
and hose clamps until the hoses are routed through
them.
Center Frame Tire Installation
1.
All lifts and hubs come already assembled from the
factory.
2.
Install tire and wheel assemblies on hubs.
3.
Recommended tires for center frame:
280/70R15 tires (20’ - 24’ models),320/R15 tires (28’
- 34’ models)
Do not attempt to lift heavy parts (such as the pull
hitch) manually. Use a hoist or a fork lift to move
these parts into position.