2-4
7K555
ASSEMBLY OF OPTIONAL EQUIPMENT
Acre Meter (Optional)
The acre meter, consisting of three main parts; the acre
meter, the pick-up, and the magnet wheel, is mounted on
the left front side of the seedbox.
1. Drill 13/32” holes into seedbox at location shown.
2. Next, use 3/8-16 x 1” bolts, lockwashers, and nuts to
attach the bracket which holds the acre meter, as
shown, onto the left front of the seedbox.
3. Mount the acre meter onto this bracket with #10-24 x
1” bolts, lockwashers and nuts.
4. Then run the wire from the bottom of the meter down
the side of the seed box and along its left side. Use
mounting bases to hold the wire in place. Direct it
across the plate which attaches the seedbox to the
end plate.
Figure 2-4: Acre Meter (1 of 2)
1XW´
'ULOO´
+ROHV
/RFNZDVKHU´
/RFNZDVKHU
1XW
3LFNXS%R[
&DEOH
$FUH0HWHU
&DEOH
0RXQWLQJ
%DVH
%ROW
;´
)URQWRI
6HHGHU
$FUH0HWHU
$VVHPEO\
;´
%ROW