C
Version: 14.02.2014
Operation:
300 bar
The ball valve should be fully closed to ensure the final
pressure will be 300bar.
200 bar
The ball valve should be completely opened to reduce the
pressure to 200 bar. The opened ball valve ensures an air
flow to the 200 bar fill connector.
S W I T C H O V E R D E V I C E 2 0 0 / 3 0 0 B A R
ATTENTION
Operate ball valve only if filterhousing has been vented by using the drainage valve.
i
Switch over device system
Drainage valve
D - 9
LW 225 E - 245 B
Summary of Contents for LW 225 E
Page 3: ...A Operating Instructions Breathing Air Compressor LW 225 E LW 245 B Version 02 14 E ...
Page 15: ...A S A F E T Y P R E C A U T I O N S ...
Page 22: ...A I N S TA L L AT I O N ...
Page 31: ...A O P E R AT I O N ...
Page 39: ...A R E M E D Y I N G FA U LT S ...
Page 44: ...A M A I N T E N A N C E A N D S E R V I C E ...
Page 73: ...A M A I N T E N A N C E R E C O R D S ...
Page 82: ...B ERSATZTEILLISTEN SPARE PARTS LISTS DETAILANSICHTEN DETAILED VIEWS ...
Page 111: ...C O P T I O N S Version 11 12 D ...
Page 113: ...C A U T O S H U T D O W N D 2 LW 225 E 245 B ...
Page 116: ...C A U T O M A T I C C O N D E N S AT I O N D R A I N D 5 LW 225 E 245 B ...
Page 118: ...C S W I T C H O V E R D E V I C E 2 0 0 3 0 0 B A R D 7 LW 225 E 245 B ...
Page 121: ...C A D D I T I O N A L F I L L I N G H O S E D 10 LW 225 E 245 B ...