Page A - 35
A
LW 225 E / LW 245 B
Version: 19.11.2015
O P E R A T I O N
Filling procedure
1. Close all filling valves.
2. Connect the closed compressed air cylinders.
3. Open cylinder valves.
4. Start the compressor
5. When filling pressure gauge increases, open filling valves slowly.
6. Fill the compressed air cylinders to the desired pressure; close slowly the valves of the cylinders.
7. Switch off the compressor.
8. Close and vent all filling valves.
9. Disconnect all compressed air cylinders from filling valves.
10. Open condensate drain valves manually.
Caution! Fill only cylinders which:
- are marked with the test mark and the test stamp of the expert.
- have been hydrostatic tested (check last test date).
- are rated for the final pressure.
- are free from humidity.
i
Note
The unit must be stopped manually when final pressure is reached. No serial auto shut
down. The unit must also be started manually.
i
Caution
Vent condensate drain valves every 15-30 minutes manually.
i
Summary of Contents for LW 225 E
Page 3: ...A Operating Instructions Breathing Air Compressor LW 225 E LW 245 B Version 02 14 E ...
Page 15: ...A S A F E T Y P R E C A U T I O N S ...
Page 22: ...A I N S TA L L AT I O N ...
Page 31: ...A O P E R AT I O N ...
Page 39: ...A R E M E D Y I N G FA U LT S ...
Page 44: ...A M A I N T E N A N C E A N D S E R V I C E ...
Page 73: ...A M A I N T E N A N C E R E C O R D S ...
Page 82: ...B ERSATZTEILLISTEN SPARE PARTS LISTS DETAILANSICHTEN DETAILED VIEWS ...
Page 111: ...C O P T I O N S Version 11 12 D ...
Page 113: ...C A U T O S H U T D O W N D 2 LW 225 E 245 B ...
Page 116: ...C A U T O M A T I C C O N D E N S AT I O N D R A I N D 5 LW 225 E 245 B ...
Page 118: ...C S W I T C H O V E R D E V I C E 2 0 0 3 0 0 B A R D 7 LW 225 E 245 B ...
Page 121: ...C A D D I T I O N A L F I L L I N G H O S E D 10 LW 225 E 245 B ...