Page A - 30
A
LW SC-300 E / LW SC-350 E
Version: 06.12.2022
O P E R A T I O N
Filling procedure
Note
The unit shuts down when final pressure is reached. Thus, the unit always has to be
restarted manually.
i
Caution! Fill only cylinders which:
- are marked with the test mark and the test stamp of the expert.
- have been hydrostatic tested (check last test date).
- are rated for the final pressure.
- are free from humidity.
i
1. Close all filling valves.
2. Connect the closed compressed air cylinders.
3. Open cylinder valves.
4. Start compressor by pushing the ON button.
5. When the filling pressure gauge increases, open the filling valves slowly.
6. Fill compressed air cylinders to the desired pressure, subsequently close the filling valves slowly.
7. Close and vent all filling valves.
8. Disconnect all compressed air cylinders from filling valves.
Summary of Contents for SC-300 E
Page 3: ...A Operating Instructions Breathing Air Compressor LW SC 300 E LW SC 350 E Version 12 22 E...
Page 12: ...A S A F E T Y P R E C A U T I O N S...
Page 19: ...A I N S TA L L AT I O N...
Page 26: ...A O P E R AT I O N...
Page 34: ...A R E M E D Y I N G FA U LT S...
Page 39: ...A M A I N T E N A N C E A N D S E R V I C E...
Page 67: ...A M A I N T E N A N C E R E C O R D S...
Page 75: ...E A T T A C H M E N T Version 11 12 E...
Page 79: ...INFORMATIONON THE SERVICE LIFE OF L W HIGH PRESSURE HOSES...
Page 87: ...ANNEX...