3.4  Cabling 

 

 

Use four twisted-pair, Category 5e or above cabling for RJ-45 port connection. The 

cable between the  switch and the link partner (switch,  hub,  workstation, etc.) must 

be less than 100 meters (328 ft.) long. 

 

Fiber  segment  using 

single-mode

  connector  type  must  use9/125  µm  single-mode 

fiber cable. User can connect two devices in the distance up to 

30km

 

Fiber segment using 

multi-mode

 connector type must use 50 or 62.5/125 µm multi-

mode fiber cable. User can connect two devices up to 

2km

distances. 

 

Gigabit SFP (mini-GBIC) port:

 

The  small  form-factor  pluggable  (SFP)  is  a  compact  optical  transceiver  used  in  optical 

communications  for  both  telecommunication  and  data  communications.  The  SFP  slots 

supporting Gigabit speed up to 1000Mbps. They are used for connecting to the network 

segment  with  single  or  multi-mode  fiber.  You  can  choose  the  appropriate  SFP 

transceiver  to  plug  into  the  slots.  Then  use  proper  multi-mode  or  single-mode  fiber 

according to the transceiver. With fiber optic, it transmits at speed up to 1000 Mbps and 

you can prevent noise interference from the system. 

 

To connect the transceiver and LC cable, please follow the steps shown below: 

 

First,  insert  the  transceiver  into  the  SFP  module.  Notice  that  the  triangle  mark  is  the 

bottom of the module. 

 

Transceiver to the SFP module 

 

Summary of Contents for IPES-3424DSFP-2P

Page 1: ...IPES 3424DSFP 2P IES 3424DSFP 2P 24 10 100TX PoE 4 DualSpeed SFP Industrial L2 Switch w ITU G 8032 Ring User Manual Hardware Mar 2022...

Page 2: ...y an STP network cable in demanding electrical environments Examples of demanding indoor environments are where the network cable is located in parallel with electrical mains supply cables or where la...

Page 3: ...consent of Lantech Communications Global Inc Products offered may contain software which is proprietary to Lantech Communications Global Inc The offer or supply of these products and services does no...

Page 4: ...occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encourage...

Page 5: ...2 3 LED Indicators 7 Chapter 3 Hardware Installation 8 Hardware installation 8 3 1 Rack Mounting 10 3 2 Wiring the Power Inputs 12 3 3 Wiring the Fault Alarm Contact 14 3 4 Cabling 15 3 5 USB Dongle...

Page 6: ...pter 1 Introduction Lantech I P ES 3424DSFP 2P is a high performance L2 managed industrial switch which provides L2 wire speed and advanced security function for network aggregation and backbone deplo...

Page 7: ...re Description In this paragraph it will describe the Industrial switch s hardware spec port cabling information and wiring installation 2 1 Physical Dimension Metal case IP 30 440 W x 325 D x 44 H mm...

Page 8: ...3 IES 3424DSFP 2P...

Page 9: ...t access to hazardous parts e g electrical conductors moving parts and the ingress of solid foreign objects Level Object size protected against Effective against 0 No protection against contact and in...

Page 10: ...est duration 10 minutes Water equivalent to 3 mm rainfall per minute 3 Spraying water Water falling as a spray at any angle up to 60 from the vertical shall have no harmful effect Test duration 5 minu...

Page 11: ...at least 1 m measured at bottom of device and at least 15 cm measured at top of device 8 Immersion beyond 1 m The equipment is suitable for continuous immersion in water under conditions which shall...

Page 12: ...ff Power 1 is inactive PWR2 Green On Power 2 is active Off Power 2 is inactive FAULT Red On Power or port failure Off No failure RJ 45 Link Ack On A network device is detected Blinking The port is tra...

Page 13: ...the Industrial switch in a 19 inch Rack 4 Power on the Industrial switch Please refer to the Wiring the Power Inputs section for knowing the information about how to wire the power The power LED on t...

Page 14: ...9 7 When all connections are set and LED lights all show in normal the installation is complete...

Page 15: ...equipment rack brackets included with the switch Cross head screwdriver not provided Four standard equipment rack screws not provided Perform this procedure to install the switch in a 19 inch equipme...

Page 16: ...11...

Page 17: ...system power input 1 and 2 The power input module 2 is optional part 1 Insert DC power wires into the contacts and for power 1 or and 1 for power 2 2 Tighten the wire clamp screws for preventing the...

Page 18: ...13 NOTE The wire gauge for the terminal block should be in the range between 12 24 AWG...

Page 19: ...e switch will detect the fault status of the power failure or port link failure available for managed model and then forms an open circuit The following illustration shows an application example for w...

Page 20: ...tor pluggable SFP is a compact optical transceiver used in optical communications for both telecommunication and data communications The SFP slots supporting Gigabit speed up to 1000Mbps They are used...

Page 21: ...16 Transceiver Inserted Second insert the fiber cable of LC connector into the transceiver LC connector to the transceiver...

Page 22: ...follow the steps shown below First press the upper side of the LC connector to release from the transceiver and pull it out Remove LC connector Second push down the metal loop and pull the transceive...

Page 23: ...18 3 5 USB Dongle The USB slot is to backup and restore the setting of switch automatically by any USB dongle It doesn t need any configuration from web browser or other user interface...

Page 24: ...cable which one end is DB9 female connector and the other end is DB9 male connector Attach the end of DB9 female connector to PC or terminal and the other end of DB9 male connector to the console port...

Page 25: ...f the console port Baud Rate 115200 bps Data Bits 8 Parity none Stop Bit 1 Flow control None The settings of communication parameters Having finished the parameter settings click OK When the blank scr...

Page 26: ...21 Console login interface Notice For web based management please refer to our Software Management Manual Please contact support lantechcom tw for more information...