background image

 

18

 

Chapter 4  Network Application 

 

   

ITU G.8032 Scheme 

Lantech

 

G.8032 protocol is following ITU (International Telecommunication Unit)

 

G.8032 

v2 draft. The benefits of G.8032 are:   

 

1.  <50ms recovery time when failover 

2.  G.8032 has defined the protocol scheme, parameters, functions, test measures to be 

unified that the users can evaluate the possible network infrastructure without literally 

testing each brand in large scale.   

 

Ring Coupling 

 

 

Summary of Contents for IPGS-5 Series

Page 1: ...IPGS 3XXX IPGS 5XXX IGS 3XXX IGS 5XXX IP30 rated Series IP30 rated L2 Industrial Managed Switch w Enhanced G 8032 Ring User Manual Hardware Jul 2016...

Page 2: ...y an STP network cable in demanding electrical environments Examples of demanding indoor environments are where the network cable is located in parallel with electrical mains supply cables or where la...

Page 3: ...consent of Lantech Communications Global Inc Products offered may contain software which is proprietary to Lantech Communications Global Inc The offer or supply of these products and services does no...

Page 4: ...occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encourage...

Page 5: ...on 9 3 2 DIN Rail Mounting 10 3 3 Wall Mount Plate Mounting 12 3 4 Wiring the Power Inputs 13 3 5 Wiring the Fault Alarm Contact 14 3 6 Cabling 15 Chapter 4 Network Application 18 ITU G 8032 Scheme 18...

Page 6: ...EEE802 3at af Power over Ethernet PoE model Switch Architecture Back plane Switching Fabric Depends on model Packet throughput ability Full Duplex Depends on model Transfer Rate 14 880pps for Ethernet...

Page 7: ...put DO open collector to 40VDC 200mA Power Supply 48 VDC for 802 3af IPGS series 54VDC for 802 3at IPGS series 24 48VDC IGS 5XXX series IGS 3408DSFP 9 5 57VDC IGS 3408GSFP series 9 5 57VDC IPGS series...

Page 8: ...CE EN61000 4 11 CE EN61000 4 12 CE EN55022 Class A CE EN55024 Stability Testing IEC60068 2 32 Free fall IEC60068 2 27 Shock IEC60068 2 6 Vibration For detail specifications please refer to product da...

Page 9: ...ommission IEC Solid particle protection The first digit indicates the level of protection that the enclosure provides against access to hazardous parts e g electrical conductors moving parts and the i...

Page 10: ...ainfall per minute 2 Dripping water when tilted up to 15 Vertically dripping water shall have no harmful effect when the enclosure is tilted at an angle up to 15 from its normal position Test duration...

Page 11: ...gress of water in harmful quantity shall not be possible when the enclosure is immersed in water under defined conditions of pressure and time up to 1 m of submersion Test duration 30 minutes Immersio...

Page 12: ...and their meanings for the switch LED Color Status Meaning R M Green On The switch unit is owner switch of ITU Ring Off The switch is not owner switch PWR1 Green On Power 1 is active Off Power 1 is i...

Page 13: ...8 For PoE model On The port is operating in PoE mode SFP Port LED On A network device is detected Blinking The port is transmitting or receiving packets from the TX device Off No device attached...

Page 14: ...ow to wire the power The power LED on the Industrial switch will light up Please refer to the LED Indicators section for indication of LED lights 5 Prepare the twisted pair straight through Category 5...

Page 15: ...l is screwed on the industrial switch when out of factory If the DIN Rail is not screwed on the industrial switch please see the following pictures to screw the DIN Rail on the switch Follow the steps...

Page 16: ...sert the top of DIN Rail into the track 2 Then lightly push the DIN Rail into the track 3 Check if the DIN Rail is tightened on the track or not 4 To remove the industrial switch from the track revers...

Page 17: ...s to remove the DIN Rail 2 Place the wall mount plate on the rear panel of the industrial switch 3 Use the screws to screw the wall mount plate on the industrial switch 4 Use the hook holes at the cor...

Page 18: ...insert the power wire 1 Insert AC or DC power wires into the contacts 1 and 2 for power 1 or 5 and 6 for power 2 Tighten the wire clamp screws for preventing the wires from loosing NOTE The wire gauge...

Page 19: ...e switch will detect the fault status of the power failure or port link failure available for managed model and then forms an open circuit The following illustration shows an application example for w...

Page 20: ...tor pluggable SFP is a compact optical transceiver used in optical communications for both telecommunication and data communications The SFP slots supporting Gigabit speed up to 1000Mbps They are used...

Page 21: ...16 Transceiver Inserted Second insert the fiber cable of LC connector into the transceiver LC connector to the transceiver...

Page 22: ...follow the steps shown below First press the upper side of the LC connector to release from the transceiver and pull it out Remove LC connector Second push down the metal loop and pull the transceive...

Page 23: ...munication Unit G 8032 v2 draft The benefits of G 8032 are 1 50ms recovery time when failover 2 G 8032 has defined the protocol scheme parameters functions test measures to be unified that the users c...

Page 24: ...19 Multiple Rings...

Page 25: ...20 Dual Homing Chain...

Page 26: ...21...

Page 27: ...or Attach the end of RS 232 connector to PC or terminal and the other end of RJ 45 connector to the console port of the switch The connected terminal or PC must support the terminal emulation program...

Page 28: ...f the console port Baud Rate 115200 bps Data Bits 8 Parity none Stop Bit 1 Flow control None The settings of communication parameters Having finished the parameter settings click OK When the blank scr...

Page 29: ...24 Console login interface Notice For web based management please refer to our Software Management Manual at http www lantechcom tw global eng support downloads html...

Reviews: