Jona Slim X2 60/90: Asennus- ja käyttöohje/Installation and user manual/Bruksanvisning
14
EN
INSTALLER SIGNED PRODUCT TEST DOCUMENT
During installation, the installer must must check the checklist below. Please note that the first checkpoints take place before the actual
installation. By signing the document, the installer ensures the installation has been carried out in accordance with the installation instructions
and that the appliance is functioning properly and is flawless.
■
In case any of the checkpoints 1) to 7) above are not in order, the installer must immediately contact the seller/customer
as well as Lapetek service at +358 9 2511 030 for further information.
■
In case checkpoint 3) is not in order, the installer must contact the customer/seller and let them know that the house has a problem
in the ventilation duct that decreases airflow.
■
The warranty granted by Lapetek is conditional on the completion of this document and the certification of the condition
of the checkpoints. A copy of the test document must be submitted with a product reclamation.
Installer’s signature
Clarification of the installer’s name
Company name
Date and place
LAITTEEN TESTAUSPÖYTÄKIRJA
INSTALLER SIGNED TEST DOCUMENT
GRANSKNINGSPROTOKOLL
Before installation:
1.
The appliance is externally in good condition when removed from packaging and includes all its parts.
The appliance has no imperfections/visible defects/color defects/bumps/scratches/etc.
After installation:
2.
The motor starts and all speeds work properly.
3.
Check that the suction power is perfect after installation. In case the suction power is poor after installation,
Check that power adjustment is OK, external motor works properly and there is nothing in the piping causing
decrease of the air flow.
4.
Flow control damper opens/closes.
5.
Lights are working.
6.
Power control of the lights are lights are working (EC models only).
7.
The device is set to X2 (= the motor cannot be switched off).