ZEUS
23
English
I5
I6
I7
CHECKING THE HEAT EXCHANGE RADIATOR
Always keep the heat exchange radiator (
I5
) on the electronic
control box clean, in order to guarantee correct heat exchange
with the ambient air.
We suggest cleaning using a jet of compressed air.
PRESSURE SWITCH SEAL CHECK
Check that no material is escaping from the safety hole (
I6
) at the
bottom of the protective container.
If necessary, replace the O-Ring for the pressure sensor (
I7
).