NMS045 Reference Manual
Installing the NMS045 on the TRP019 Pole
3-4
FIGURE 3-4
Battery placement
Step 2
Place the main plate on the outside of the box, on the
battery plate shoulder screws.
TAKE NOTE
The main plate should have all the components installed,
and the gateway network ready. For these steps, see 2.4 "Assembling
Main Plate & Components" on page 2-3.
FIGURE 3-5
831C-045 on Shoulder Screws
3.3.3 Routing Cables in the Pole
Before you begin:
• If desired, feed the cables through the included flexible tubing
for protection. Figure 3-6 Cable Protection shows the protected
cables during installation.
One battery placement
Two battery placement
Battery plate shoulder
screws are designed to
hold the main plate as
you work on it.