NMS045 Reference Manual
Installing the NMS045 on the TRP019 Pole
3-5
FIGURE 3-6
Cable Protection
FIGURE 3-7
Cables in TRP019
Step 1
Open the back of the pole as shown in Figure 3-8 "Back of
CBL233-12 Solar Outlet (red)
CBL222-20 Signal Outlet (green)
CBL229-20 Weather Outlet (blue)
CBL222-20 &
CBL229-20 route
through top hole
CBL233-12 route
through bottom
B
C
A