background image

Megatower Operation Manual 

Page 

3

 of 

5

 

transport/storage.  At this point, the mast is ready 
to  be  elevated.  Press  the  up  button  on  the 
orange pendant and the mast will start to elevate 
horizontally 

to 

its 

upright 

position. 

Elevate the mast to its full 90 degrees and 

verify

 

that the mast is still level.  

8.) 

Once mast  is  elevated,  install  the mast  retaining 
pin.  Push  the  mast  retaining  pin  opposite  of  the 
operator,  and  then  rotate  the  pin  down  until  it 
locks into place. The red beacon light will turn off 
once the pin is locked in place. At this point, the 
hydraulics  will  no  longer  function  while  the  mast 
is elevated. 

9.) 

Inside the control panel, rotate air valve to deploy 
(closed)  position.  Locate  the  compressor  switch 
and  turn  switch  ON.  You  should  hear  the  air 
compressor  engage.  Once  enough  air  pressure 
is  built,  the  mast  will  start  to  vertically  elevate. 

The  mast  can  take  up  to  20  minutes  to  fully 
deploy  and  it  is  normal  for  several  compressor 
cycles  during  this  time. 

WATCH  CABLES  TO 

ENSURE  THEY  DO  NOT  GET  SNAGGED 
WHILE  ELEVATING!

  Cables  are  positioned 

designed  to  prevent  snags  but  keep  a  look  out 
when  elevating.  Once  fully  deployed,  the 
compressor  should  only  cycle  every  20  minutes 
for  15  seconds.  The  compressor  switch  should 
remain  in  the  ON  position  for  the  duration 
deployed in order to keep the mast elevated.

 

10.) 

Once  the  mast  is  fully  deployed,  it  is  time  to 

power  on  the  lights.  This  is  done  by  flipping  the 
four  switches  located  on  the  breaker  box 
opposite  the  control  box.  The  lights  are  wired  in 
banks  of  four,  from  left  to  right.  Each  switch 
operates  a  single  bank:  left,  center  left,  center 
right, right. With this setup, operators can choose 
the  amount  of  illumination  required  for  the 
specific task at hand. 

 

At  this  point  the  mast  is  fully  deployed  and 
ready for use. 

WARNING

:

   

The  light  mast  at  50’  is  rated  for  wind 

speeds  up  to  25  MPH.  If  deployed  in  wind  speeds 
higher than this, the mast must be guyed or the mast 
will need to be lowered to 25’. At 25’ the mast is rated 
for 40 MPH. Any higher wind speeds, and we suggest 
that  you  lower  the  mast  completely.  Failure  to  do  so 
may result in damage to the mast. 

 

Reviews: