Megatower
Larson Electronics, LLC
Phone: (877) 348-9680
Fax: (903) 498-3364
www.larsonelectronics.com
16 of 6
7
At this point you should have...
•
Dropped the trailer from the tow
vehicle
•
Deployed leveling jacks and leveled
trailer
•
Deployed outriggers
•
Unlatched light head safety latch
•
Generator running
•
Mast safety pin is in the open position
•
Amber LED beacon is blinking
Fi
gure
3
.
1
1
If you missed a step go back to the
beginning and verify the steps have been
completed in order.
3.
11
.)
You can now raise the mast to an
upright position. Press and hold the HYDRAULIC
RAM UP button to raise the mast to an upright
position. Once fully upright, set the safety pin at
the base back into place.
NOTE: Once fully upright, ensure the mast is
still level before you attempt to raise the mast
to the desired height.
Check if mast is level by
using user level in between the four leveling
jacks at the front of the trailer.
3.
1
2
.)
T
o raise the mast you will need
to start the air compressor. Do this by
turning the COMPRESSOR switch
to
ON.
NOTE:
If the compressor doesn’t start check
the breaker box above the operating panel
.
Ensure breaker #5, the 30A breaker, is in the ON
position.
F
igure
3
.
1
2.1