14
Tripod set up
▪
Select a place as close and practical
to the work site as possible, and ensure
that the location is clear of traffic.
▪
Extend the tripod legs to the required
height and then spread the legs wide
enough so that the tripod platform is
stable.
▪
Place the laser level onto the tripod
with the lighthouse facing upwards and
thread the yoke into the base until firm.
Do not over tighten as this may cause
damage to the laser level or tripod.
Level surface set up
▪
Select a place as close and practical
to the work site as possible, and ensure
that the location is clear of traffic.
▪
Place the laser level onto a reasonably
level surface with the lighthouse facing
upwards.
HORIZONTAL MEASUREMENT SET UP
Summary of Contents for HV2G
Page 1: ...H V 2 G R O TA R Y L A S E R I N S T R U C T I O N M A N U A L...
Page 5: ...5 Rotating laser port Charging port Control panel LASER OVERVIEW FRONT Battery screw...
Page 9: ...9 REMOTE CONTROL OVERVIEW BACK Battery compartment...
Page 11: ...11 DETECTOR OVERVIEW BACK Battery compartment Staff clamp thread LCD display screen...
Page 28: ...www spoton com au...