Initial Set-Up
Pre-Operation Equipment Inspection Checklist
3
3-16
WZ1000 6/5/23
Initial Set-Up
Ensure the discharge chute is clear of debris, properly mounted, and in good condition.
Inspect entire Lastec Mower for loose or entangled parts, debris, obstructions, or neglected tools.
Check engine for abnormal exhaust or sounds.
Record the hour meter setting if desired.
Complete the appropriate maintenance checklist (section 5).